Abstract:Research purposes: By analyzing the depth into the rock of artificial covering layer and the overall stability of structure under different boundary conditions,and providing an optimal design method that is used to temporary water bridge and platform in the condition of deepwater’s bare rock bed,their safety and reliability are ensured.
Research conclusions: ( 1) To reduce the workload of blasting,the form of short piling can be used in the artificial covering layer at bare rock bed. The depth into rock,that is calculated by using“Lalyqin hypothesis”in the short piling condition,can make sure their safety and reliability; ( 2) Because inability to accurately calculate the artificial covering layer for bridge pile and piles of lateral resistance platform,two constraint ways of hinge end and consolidation at the bottom of pile can be used for calculation. The actual results are between their two results; ( 3) If temporary bridge piles and platform piles can’t meet the safety and reliability requirements in an independent state,the connection between the two systems should be increased. The specifications,quantity and location of the connection system need to be analyzed by the overall analysis of system’s strength and stability.
Zhou Hong,Meng Yuan. Building of Construction Platform for Steel Casing of Bored Piles in Deep Water and Uncovered Rock [J]. Construction Technology,2009( 8) : 69 - 70.
Ouyang Xiaoyong, Ren Guoxing, Xu Wei. Key Cconstruction Contechnologies of Bridge Piles Foundation in Deep Water [M]. Beijing: China Communications Press,2006.
HU Guowei, Zhang Yuning, Zhang Junbing, etc.Research on the Space Stress - distribution Characteristics of Long - span and Complex Structure Bridge during the Whole Construction Process [J].Journal of Railway Engineering Society,2010( 3) : 43 -48.
Hu Yong,Guo Qingzhi,Zhang Huijun. Design and Construction Ofbored Pile Platform in Deep Water and Uncovered Rock of Sanmenjiang Bridge in Liuzhou[J].West China Exploration Engineering,2007( 6) : 15 - 18.
Xie Guangjian,Zou Gaoding,Peng Ning. Application for Movable Lattice Grid Platform Construction Technic in the Bare Rock StreamBed Area[J]. West China Exploration Engineering,2009,( 3) : 163 - 165.