Study on Settlement Controlling Effects for Foundation with Piles Thrusted - expanded in Column - hammer along High Speed Railway in Collapsible Loess Region
QU Yao - hui,WEI Yong - liang,WU Xiao - peng,MI Wei - jun
Northwest Research Institute Co. Ltd of China Railway Engineering Corporation,Lanzhou,Gansu 730000,China
Abstract:Research purposes: Settlement controlling is a key technical problem of high - speed railway construction in collapsible loess regions. The papers rely on collapsible loess subgrade test engineering along Zhengzhou - Xi'an high speed railway,by carrying on settlement observations,large water immersion test and foundation settlement forecast, research on settlement characteristics,effects of collapsibility elimination and settlement controlling of foundation with piles thrusted - expanded in column - hammer under high - speed railway technology conditions. It can provide technical reserves in collapsible loess regions along high speed railway.
Research conclusions: The maximum treatment depth of piles thrusted - expanded in column - hammer is 20 - 30 m. The result show that,dealed with 22 m piles thrusted - expanded in column - hammer,the roadbed rarely occures settment and the collapsibility of reinforced layer also eliminates. The roadbed don' t need to preload. Thus,piles thrusted - expanded in column - hammer can obtain the expected results in settlement controlling in large thickness collapsible loess site.
屈耀辉,魏永梁 武小鹏 米维军. 黄土区高铁柱锤冲扩桩地基沉降控制效果研究[J]. 铁道工程学报, 2012, 29(1): 21-25.
QU Yao - hui,WEI Yong - liang,WU Xiao - peng,MI Wei - jun. Study on Settlement Controlling Effects for Foundation with Piles Thrusted - expanded in Column - hammer along High Speed Railway in Collapsible Loess Region. 铁道工程学报, 2012, 29(1): 21-25.
Northwest Research Institute Co. Ltd of CREC. Loess Research and Practice of Railway Engineering [M]. Lanzhou: Northwest Research Institute Co. Ltd,2005.
[3] GB 50007—2002,建筑地基基础设计规范[S].
GB 50007—2002,Code for Design on Ground and Foundation of Buildings[S].
[4] JGJ 79—2002,建筑地基处理技术规范[S].
JGJ 79—2002,Technical Code for Ground Treatment of Buildings[S].
[5] TB 10414—2003,铁路路基工程施工质量验收标准[S].
TB 10414—2003,Standard for Constructional Quality Acceptance of Railway Subgrade Engineering[S].
Gu Xiangsheng. Discussion on Some Issues in Construcyion of Subgrade of Passenger Dedicated Line [J]. Journal of Railway Engineering Society,2005( 1) : 31 - 38.