铁道工程学报  2008, Vol. 25 Issue (3): 33-37    DOI:
Current Issue | Archive | Adv Search |
Analysis of the Key Process and the Technical Method for Construction of the Bridge and Culvert Base on Existing Line with Jacking Method
ZHANG Qun-sheng
China Railway Seventh Group Co. Ltd., Zhengzhou, Henan 450016, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech