|
|
Study on Construction Control of Large Span Prestressed Concrete Curved Continuous Box Beam |
BAI Hai-feng |
China Railway No.9 Group Co. Ltd, Shenyang, Liaoning 110013, China |
|
|
Abstract Research purposes: Considering the variations of flexibility, stress and geometrical configuration of large span curved continuous beam or continuous rigid frame bridge in the course of construction, the study is done on the issues of flexibility and geometrical configuration control and stress measurement.
Research results: The speck analytical and controlling method for flexibility and configuration control and stress measurement in beam with cantilever wall basket constructing method has been presented. The results show that the flexibility and configuration of the bridge adequately confirm with requirements of design and bridge construction codes.
|
Received: 07 February 2007
|
|
|
|
|
[1]黄建跃,王树林,刘成龙,等.大跨度连续刚构桥施工主梁变形监测的必要性与方法[J].桥梁建设,2003(1):48-51.
[2]周国文.江湾大桥主桥连续箱梁变形(高程)监测[J].华东地质学院学报,1997,20(1):52-55.
[3]李庆华.材料力学[M].成都:西南交通大学出版社,1994.
[4]叶列平.混凝土结构(上册)[M].北京:清华大学出版社,2002.
|
|
|
|