Abstract Research purposes:The Dahuofang water tunnel is a super long deep-buried tunnel with the length of main tunnel of 85.32 km and excavation diameter of 8.03 m. TBM was used as main construction method along with bored blasting method for construction of the tunnel. As the tunnel passed through the area with complicated hydrogeologic conditions, it was necessary to do the works of TBM type-selection and optimization of the support system so as to solve the technical problems related to the stability of surrounding rock, water inrush of the tunnel, tunneling efficiency in quartz sandstone area and rock outburst while tunneling.
Research conclusions:Based on studying a large number of data and TBM construction cases, the main engineering geological problems in the area where the tunnel passed through were analyzed. Based on the analysis of TBM construction experiences at home and abroad, it was decided to adopt the open-type TBM for construction of the tunnel and to adopt the composite lining structure made up of bolt-shotcrete support+cast concrete lining as support system of tunnel instead of segment lining. It played an important role in construction of tunnel and could be as the reference to the similar projects in the future.
|
Received: 05 November 2009
|
|
|
|
|
[ 1 ] 梅志荣,高菊茹,唐与,等.大伙房输水工程特长隧洞TBM施工关键技术研究[R]. 成都:中铁西南科学研究院, 2009.
MeiZhirong, Gao Juru, Tang Yu, et al. Study on Key Construction Technology for Super-long Tunnel of Dahuofang Transfer Project[R]. Chengdu: China Railway Southwest Research Institute, 2009.
[ 2 ] 梅志荣,张军伟,章元爱,等.大伙房输水工程特长隧洞施工方法优化与TBM选型研究[C]//第五届中日盾构隧道技术交流会.成都:西南交通大学, 2009: 204-313.
Mei Zhirong, Zhang Junwei, Zhang Yuanai, et al. Study on Optimization of Construction Method and TBM Lectotype technology of Super-long Tunnel[C] //The Conference for the Fifth Chinese and Japanse Shield Tunnel Technology. Chengdu: Southwest Jiaotong University, 2009: 204 -313.
[ 3 ] 周佳媚,李志业,高波. TBM施工隧道仰拱预制块的受力分析[J]. 中国铁道科学, 2004(3): 32 -35.
Zhou Jiamei, Li Zhiye, Gaobo. Mechanic Analysis of Invert Prefabricate in TBM Construction Tunnel[J]. China Railway Sciences, 2004(3): 32 -35.
[ 4 ] 王梦恕,李典璜,张镜剑,等.岩石隧道掘进机(TBM)施工及工程[M]. 北京:中国铁道出版社, 2004.
Wang Mengshu, Li Dianhuang, Zhang Jingjian, et al. Tunneling with Rock TBM and Related Case Histories[M]. Beijing:China Railway Publishing House, 2004.
[ 5 ] 尹俊涛,尚彦军,傅冰骏,等. TBM掘进技术发展及有关工程地质问题分析和对策[J]. 工程地质学报, 2005(3):389 -397.
Yin Juntao, Shang Yanjun, Fu Bingjun, et al. Development of TBM Excavation Technology and Analyses and Countermeasures of Related Engineering Geological Problems[J]. Journal of Engineering Geology, 2005(3): 389-397.
[ 6 ] 张镜剑,傅冰骏.隧道掘进机在我国应用的进展[J]. 岩石力学与工程学报, 2007(2): 226 -238.
Zhang Jingjian, Fu Bingjun. Advances in Tunnel Boring Machine Application in China[J]. Chinese Journal of Rock Mechanics and Engineering, 2007(2): 226-238.
[ 7 ] 钱七虎,李朝甫,傅德明.全断面掘进机在中国地下工程中的应用现状及前景展望[J]. 建筑机械, 2002(5): 28 -35.
Qian Qihu, Li Chaofu, Fu Deming. Application Situation and Out look of TBM in Underground Project in China[J]. Construction Machinery, 2002(5): 28-35.
[ 8 ] ITA Working Group, Recommendations and Guidelines for Tunnel Boring Machine[R]. ITA, 2000: 10 -20.
[ 9 ] Katsushi Miura. Design and construction of mountain tunnels in Japan[J]. Tunnelling and Underground Space Technology, 2003(18): 115 -126.
[ 10 ] C.Carranza-Torres, M.Diederichs. Mechanical analysis of circular liners with particular reference to composite supports[J]. Tunnelling and Underground Space Technology, 2009(24): 506 -532.
[ 11 ] Kourosh Shahriar, Mostafa Sharifzadeh, Jafar Khademi Hamidi. Geotechnical risk assessment based approach for rock TBM selection in difficult ground conditions[J]. Tunnelling and Underground Space Technology, 2008(23): 318 -325. [ 12 ] ThomasKasper, et al. A numerical study of the effect of soil and grout material properties and cover depth in shield tunneling[J]. Computers and Geotechnics, 2006 (33): 234 -247.
|
|
|
|