Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Quick Search  
  Adv Search
2010 Vol. 27, No. 3
Published: 15 March 2010

 
1 Study and Application of Long-term Monitoring System for Permafrost Area along Qinghai-Tibet Railway
AN Guo-dong, MI Long, ZHU Ben-zhen, RAN Li
2010 Vol. 27 (3): 1-6 [Abstract] ( 2519 ) HTML (1 KB)  PDF  (629 KB)  ( 375 )
7 Research on the Scheme for Leading Longkou-Yantai Railway into Yantai Region
WANG Qing-hui, SUN Zhao-wu, WANG Gang
2010 Vol. 27 (3): 7-10 [Abstract] ( 2562 ) HTML (1 KB)  PDF  (340 KB)  ( 114 )
11 Research on the Green Railway Construction in Southwest Mountainous Area
XIONG Chun-mei, YANG Li-zhong
2010 Vol. 27 (3): 11-14 [Abstract] ( 2514 ) HTML (1 KB)  PDF  (173 KB)  ( 147 )
15 Analysis of the Characteristics of Gobi Sand-driving wind in Shisanjianfang Section of Lanzhou-Xinjiang Railway
LI Kai-chong, JIANG Fu-qiang, XUE Chun-xiao, YANG Yin-hai, GE Sheng-chang
2010 Vol. 27 (3): 15-18 [Abstract] ( 2557 ) HTML (1 KB)  PDF  (234 KB)  ( 135 )
19 Model for Optimal Selection of Soft Soil Treatment Schemes on Considering Uncertainty of Evaluating Indexes
ZHANG Shi-li;ZHANG Yi-fei;YUAN Hang-xin;YING Yue-long
2010 Vol. 27 (3): 19-23 [Abstract] ( 2520 ) HTML (1 KB)  PDF  (193 KB)  ( 133 )
24 Experimental Study on Improvement of Filling Material for Subgrade of Harbin-Dalian Passenger Dedicated Line
WANG Xiao-ming
2010 Vol. 27 (3): 24-27 [Abstract] ( 2568 ) HTML (1 KB)  PDF  (181 KB)  ( 165 )
28 Study on Settlement Control of Dig Jet Mixing Pile Composite Foundation and Soft Rock Filling Embankment
QING San-hui,CAO Xin-wen,XIE Qiang
2010 Vol. 27 (3): 28-32 [Abstract] ( 2676 ) HTML (1 KB)  PDF  (378 KB)  ( 107 )
33 Discussion on Schemes for Monitoring Post-construction Subsidence of Subgrade of Zhengzhou-Xi'an Passenger Dedicated Line
HAO Jin-yu, ZHU Shao-jie
2010 Vol. 27 (3): 33-36 [Abstract] ( 2674 ) HTML (1 KB)  PDF  (186 KB)  ( 250 )
37 Slope Protection Design of No.1 National Highway of the Republic of Congo
CHEN Zhi-jun,ZHENG Zhi-yong, ZHANG Sheng-bin
2010 Vol. 27 (3): 37-41 [Abstract] ( 2612 ) HTML (1 KB)  PDF  (543 KB)  ( 82 )
42 Research on the Space Stress-distribution Characteristics of Long-span and Complex Structure Bridge during the Whole Construction Process
HU Guo-wei, ZHANG Yu-ning, ZHANG Jun-bing, SHI Zhou
2010 Vol. 27 (3): 42-48 [Abstract] ( 2534 ) HTML (1 KB)  PDF  (817 KB)  ( 189 )
49 Measures for Closure of Main Arch of Dashengguan Yangtze Rive Bridge and Analyses of Monitoring Computation
HU Hui-yue
2010 Vol. 27 (3): 49-51 [Abstract] ( 2511 ) HTML (1 KB)  PDF  (339 KB)  ( 127 )
52 Discussion on the Measures for Guaranteeing Effective Prestress of Vertical Prestressed Reinforcement of Box Girder Bridge
XU Hua-xuan
2010 Vol. 27 (3): 52-56 [Abstract] ( 2604 ) HTML (1 KB)  PDF  (187 KB)  ( 166 )
57 Application of Vacuum Auxiliary Mud Jacking in Construction of Box Girder for Passenger Dedicated Line
WU An-feng
2010 Vol. 27 (3): 57-60 [Abstract] ( 2586 ) HTML (1 KB)  PDF  (212 KB)  ( 116 )
61 TBM Type-selection and Study on Optimization of Support System for Super Long Dahuofang Water Tunnel
ZHANG Jun-wei, MEI Zhi-rong, Tang Yu,ZHANG Yuan-ai
2010 Vol. 27 (3): 61-65 [Abstract] ( 2578 ) HTML (1 KB)  PDF  (329 KB)  ( 161 )
66 Study on the Adaptability of Effective Cross-section Area of the Tunnel of Beijing-Shanghai High-speed Railway
DENG Jie, YU Nan-yang, ZHAO Hai-heng
2010 Vol. 27 (3): 66-70 [Abstract] ( 2610 ) HTML (1 KB)  PDF  (461 KB)  ( 226 )
71 Method for Determining the Minimum Security Coping Thickness of Sub-aqueous Tunnel
YAN Cai-bin, ZHOU Wei
2010 Vol. 27 (3): 71-75 [Abstract] ( 2492 ) HTML (1 KB)  PDF  (338 KB)  ( 106 )
76 3D Numerical Simulation to Transient Electromagnetic Method under Effect of Whole-space
SUN Yu-guo, TAN Dai-ming
2010 Vol. 27 (3): 76-80 [Abstract] ( 2512 ) HTML (1 KB)  PDF  (466 KB)  ( 262 )
81 Technology for Treating Burst Port of Filling Solution Cavity with High-pressure and Rich Water of Yesanguan Tunnelon Yichang-Wanzhou Railway
ZHANG Mei, ZHANG Min-qing, SUN guo-qing
2010 Vol. 27 (3): 81-86 [Abstract] ( 2594 ) HTML (1 KB)  PDF  (466 KB)  ( 205 )
87 Comparative Analysis and Selection of Construction Methods for Large Section Loess Tunnel
ZHANG Ying-cai, HU Guo-wei, XIN Zhen-xing
2010 Vol. 27 (3): 87-92 [Abstract] ( 2596 ) HTML (1 KB)  PDF  (622 KB)  ( 719 )
93 Application of Cross-section Measurement System in Measurement of Wall Rock's Change of Tunnel
CHEN Shu-guang
2010 Vol. 27 (3): 93-96 [Abstract] ( 2518 ) HTML (1 KB)  PDF  (249 KB)  ( 97 )
97 Research on the Management of Supervision in BT Mode for Line 5 of Shenzhen Metro
DAI He-gen
2010 Vol. 27 (3): 97-100 [Abstract] ( 2576 ) HTML (1 KB)  PDF  (193 KB)  ( 178 )
101 Practice and Exploration on the Integration of Design and Construction in BT Construction Mode for Line5 of Shenzhen Metro
LIU Cheng-jun, ZHU Gao-ming, LI Hai-ming
2010 Vol. 27 (3): 101-104 [Abstract] ( 2505 ) HTML (1 KB)  PDF  (118 KB)  ( 334 )
105 Measurement in Metro Construction with Subsurface Excavation Method and Feedback Technology
SONG Yi-rong, CHEN Guang-feng, XIA Shi-long, LI Li-xia, ZHAO Rong
2010 Vol. 27 (3): 105-108 [Abstract] ( 2573 ) HTML (1 KB)  PDF  (257 KB)  ( 189 )
109 Experimental Research on the Temperature Change of Subway Station during Construction
QI Feng, WANG Wei, ZHANG Ye-tian
2010 Vol. 27 (3): 109-113 [Abstract] ( 2522 ) HTML (1 KB)  PDF  (687 KB)  ( 133 )
114 Research on the Technical Scheme for Guangzhou-Qingyuan Intercity Rail Transit
LI Cheng-lei
2010 Vol. 27 (3): 114-117 [Abstract] ( 2700 ) HTML (1 KB)  PDF  (168 KB)  ( 122 )
118 Technology for Originating Construction of Shield Tunnel in Soft Soil Stratum in Shanghai
BAO Yong-liang, ZHENG Qi-zhen, TANG Jian-zhong
2010 Vol. 27 (3): 118-122 [Abstract] ( 2623 ) HTML (1 KB)  PDF  (289 KB)  ( 121 )
123 Study on Distribution Proportion of Profits between General Contractor and Subcontractor
GUAN Bai-hai
2010 Vol. 27 (3): 123-127 [Abstract] ( 2527 ) HTML (1 KB)  PDF  (142 KB)  ( 92 )
128 Analysis of Cost Controllability and Cost Control Methods of the Passenger Dedicated Railway Construction
LEI Shu-hua, HAN Tong-yin, WANG Shu-yu
2010 Vol. 27 (3): 128-132 [Abstract] ( 2527 ) HTML (1 KB)  PDF  (244 KB)  ( 178 )
  News
·Notice
More>>  
 
  Download
More>>  
 
  Links
  Beijing JIaotong University
  Journal of Southwest Jiaotong University
  China Association for Science and Technology
  National Library of China National Digital Library of China
  China Railway Society
  China Railway Group Limited
More>>  
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech