Experimental Research on the Temperature Change of Subway Station during Construction |
QI Feng1, WANG Wei2, ZHANG Ye-tian1 |
1. Zhejiang Forestry University, Lincan, Zhejiang 311300, China; 2. Shanghai Institute of Architectural Design and Research Co. Ltd., Shanghai 200063, China |
|
|
Abstract Research purposes:As the construction period of subway station is long and the construction technology is complicated, it is difficult to collect full temperature values and there is a little test done on the temperature change of subway station. Therefore, it is necessary to do trace test on the temperature of subway station and make the analysis of the temperature so as to provide the data support to the temperature analysis of subway station in theory.
Research conclusions:To the construction section between two induced joints of one subway station in Shanghai, the temporal temperature values of subway station were collected from the test on the different construction phase. From the statistics of the tested temperature, it was concluded that concrete temperature was affected mainly by the temperature rise of hydration and atmospheric temperature in early concrete casting stage. In medium and later concrete casting stages, the temperature change trend of subway station was basically consistent with the atmospheric temperature, and the max. day-temperature drop of the top plate and the place around induced joints was more than that of other parts and the max. Day-temperature difference between outside and inside of top plate and bottom plate was more than that of the inside lining wall. Based on the analysis of the tested data, the proposals on the definition of temperature load and the in-site maintenance were made.
|
Received: 10 August 2009
|
|
|
|
|
[ 1 ] 董云德.上海地铁二号线车站防水工程综合治理研究[J]. 施工技术, 2000(4): 10 -13.
Dong Yunde. Research on the Synthesis Management of the Waterproofing Project of the Shanghai Underground Station of Line Two[J]. Construction Technology, 2000(4): 10 -13.
[ 2 ] 许和平.富水软土地区单墙衬砌地铁车站防水技术[J]. 铁道工程学报, 2007(9): 82 -86.
Xu Heping. Waterproof Technology for Metro Station with Single W all Lining in Rich Water and Soft Soil G round[J]. Journal of Railway Engineering. 2007(9): 82 -86.
[ 3 ] 任伟新.地铁车站渗漏水问题的探讨[J]. 铁道建筑,2004(12): 24 -26.
Ren Wenxin. Research on Leakage in Subway Station[J]. Railway Construction, 2004(12): 24 -26.
[ 4 ] 朱伯芳.大体积混凝土温度应力与温度控制[M]. 北京:中国电力出版社, 1999.
Zhu Bofang. Thermal Stresses and Temperature Control of Mass Concrete[M]. Beijing: China Electric Power Press, 1999.
[ 5 ] Jensen O M,Hansen P F. Influence of Temperature on Autogenous Deformation and Relative Humidity Change in Hardening Cement Paste[J]. Cement and Concrete Research. 1999(4): 567 -575.
[ 6 ] Altoubat S A, Lange D A. Creep, Shrinkage and Cracking of Restrained Concrete at Early Age[J]. ACI Materials Journal, 2001(4): 323 -331.
[ 7 ] Hauggaard A B. Transitional Thermal Creep of Early Age Concrete[J]. Journal of Engineering Mechanics, 1999(4): 458 -465.
[ 8 ] 齐锋.地铁车站纤维混凝土结构抗渗试验及阻裂防水机理的研究[D]. 上海:上海交通大学, 2007.
Qi Feng. Study on Waterproof Test and Anti-crack Technique of Fiber Concrete Structure in Subway Station[D]. Shanghai: Shanghai Jiaotong University, 2007.
[ 9 ] 张雪松.上海地铁车站结构防水措施评述[J]. 土木工程学报, 2000(5): 107 -110.
Zhang Xuesong. The Evaluation of Water-Proofing Work for Shanghai Metro Stations[J]. Journal of Civil Engineering, 2000(5): 107 -110.
[ 10 ] 王铁行.浅层黄土温度场数值分析[J]. 西安建筑科技大学学报, 2007(4): 463 -467.
Wang Tiehang. Thermal Regim e in Shallow Soil Strata in Loess Plateau[J]. Journal of X i 'an University of Arch. & Tech., 2007(4): 463 -467.
|
|
|
|