|
|
MANUFACTURE AND DEVELOPMENT ON CALCULATION SYSTEM FOR CATERNARY PROJECT |
CHENG De-qin, LIU Yang |
Electrification engineering Bureau Group Co. Ltd of China Railway |
|
|
Abstract Based on actuality of design and construction of our country, this paper describes the necessity of development on calculation system for catenary Project. Combining the technology of electrification catenary with computer, this paper introduces the principle and idea of design, general demand, design of module function, technical feature and realistic process of catenary project in detail. The exploration of system and successful apply not only has resolved the difficult technology problem in enterprise, but also has brought considerable benefit of economy and society for enterprise, and it has been a modern tool for enterprise. This paper as a summarize of author's exploration and development for many years, it can be for reference to the counterparts in future.
|
Received: 01 June 2005
|
|
|
|
|
[1]于万聚.高速电气化铁路接触网(第一版)[M].成都:西南交通 大学出版社,,2003.
[2]KIEβLING(德).电化局译.电气化铁道接触网(第一版)[M].北 京:中国电力出版社,,2004.
[3]张海藩.软件工程导论(第三版)[M].北京:清华大学出版社, 1998.
[4]周建新.直通货物周转量计算系统的研制与应用[J].中国铁 路,2001,(12):53-33.
[5]陈灿煌.C++Builder6彻底研究(第一版)[M].北京:中国铁道 出版社,,2003.
|
|
|
|