铁道工程学报  2005, Vol. 22 Issue (4): 39-42    DOI:
Current Issue | Archive | Adv Search |
APPLICATION OF INFLUENCE MATRIX IN OPTIMISATION OF INITIAL TENSION OF INHAUL CABLE FOR LOW TOWER CABLE-STAYED BRIDGE
WANG Xue-ming1, LI Ping2
1The Seventh Engineering Department of the Fourth Construction Corporation of Gansu Province; 2 Construction Supervision Company of Gansu Province
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech