|
|
Research on the Plan for Track Joining ofX iangtang-Putian Railway |
ZHAO Zhong-bao |
China Railway Siyuan Survey and DesignGroup Co. Ltd., Wuhan, Hubei 430063, China |
|
|
Abstract Research purposes: The choice of the plan for the track joining at railway starting point and ending point directly influences the plan and arrangement of railway network and function orientation of the projec.t To seek the suitable railway line trend for the localnaturalconditionshas the profound significance. Thispapermainly researches the issues on how to join the railway tracks at railway starting point and ending point according to the railway network 's characteristics, regional economy, railway line trend, arrangement of operation site and construction investmen.t This involves awide range and lots of complicated factors.
Research conclusions:Thispaper, according to the arrangementof thewestern seacoasteconomic zone of the Straitand the characteristics of coastal cities in Fujian Province, puts forward the valuable plan for railway track joining at the ending poin,t determines the primary plan for railway track joining atending point in Fuzhou orPutian, or synchronous joining track in Fuzhou and Putian with the quantitative method along with qualitative method. Through overall and multi-level comparison and choice, and comprehensive evaluationwithmultiple targetdecision -makingmethod, it is concluded the synchronous joining track in Fuzhou and Putian is optimal and should be recommended.
|
Received: 24 June 2009
|
|
|
|
|
[1] 铁道部第一勘测设计院.铁路工程设计技术手册?线路[K].北京:中国铁道出版社, 1994.
[2] GB 50090)2006,铁路线路设计规范[S].
[3] GB 50091)2006,铁路车站及枢纽设计规范[S].
[4] 铁道第四勘察设计院.宜昌至万州铁路预可行性研究报告[R].武汉:铁道第四勘察设计院, 2001.
|
|
|
|