|
|
THE CONSTRUCTION TECHNOLOGY DEALING WITH THE WEAK STRATA OF THE BRIDGE TOWER WITH CFG PILE |
PENG Jing-shu, GAO Qiang |
Ranken Railway Construction, Ltd. |
|
|
Abstract CFG pile introduced could deal with the differential settlement between the bridge tower and its weak strata roadbed. The roadbed around the bridge tower should be treated with this method. It also can be used to deal with the weak roadbed of the high railway and the roadbed of the bridge tower for the reference of the most geo-technique engineering.
|
Received: 05 May 2003
|
|
|
|
|
|
|
|