Abstract This paper sums up experiences and lessons in the aspects of high-speed railway construction and transport organization patterns in Japan and Germany. Combining the preliminary study and design circumstances of high-speed railways in China,it conducts valuable study on several problems corresponding to station and yard of high-speed railway that have not been conducted deep study at current stage. These problems include the connecting mode between the stations of high-speed railway and that of the existing line,the options of operating pattern of high-speed railway,standard plane layout of the station of high- speed railway and its application scope. It sums up the design of stations and yards of the proposed Beijing-Shanghai High-speed Railway corresponding to the relative problems,which can be referred for study and design of high-speed railway in the future.
|
Received: 15 January 2002
|
|
|
|
|
[1]铁科院.高速铁路线桥结构与技术条件(标准)研究报告 [R],1996.
[2]鄢巨平.赴日考察收集自日本铁道建设公团的资料[Z]. |
|
|
|