EXPLORATION ON OPERATING A RUNNING SPEED OF 60 km/h FOR NEWLY-BUILT RAILWAY AND RAISING SPEED IN A SHORT TIME |
KAN Hong-ming |
First Railway Engineering Co-,Railway Engineering General Corp-of Shanghai Railway Administration Abstract After the operation of a newly-built railway trunk line,it was stipulated that the running speed of 45 km /h should be limited in a rather long time. The paper describes briefly the meaning of operating a running speed of 60 km /h for the first time in a newly-built railway line and then raising speed in a short time. Through the practical construction example,the following practice has been demonstrated. For the heavy-haul and the newly-built railways, by raising the construction technical standards and applying the advanced construction technologies,it is feasible to operate a running speed of 60 km/h for the first time,and then raising speed in a short time( 4^ 6 months) up to the normal running speed of 140 km/h. |
|
|
Abstract First Railway Engineering Co-,Railway Engineering General Corp-of Shanghai Railway Administration Abstract After the operation of a newly-built railway trunk line,it was stipulated that the running speed of 45 km /h should be limited in a rather long time. The paper describes briefly the meaning of operating a running speed of 60 km /h for the first time in a newly-built railway line and then raising speed in a short time. Through the practical construction example,the following practice has been demonstrated. For the heavy-haul and the newly-built railways, by raising the construction technical standards and applying the advanced construction technologies,it is feasible to operate a running speed of 60 km/h for the first time,and then raising speed in a short time( 4^ 6 months) up to the normal running speed of 140 km/h.
|
Received: 29 May 2000
|
|
|
|
|
[1]1994年度铁道部部级工法汇编[S].
[2]路基工程[J]. 1998,(1).
[3]高速铁路路基设计与施工[M].中国铁道出版社,1999. |
|
|
|