RESEARCH ON CONSTRUCTION TECHNIQUE FOR DEEP BORDE PILES |
WU Hong-tao |
Tunnel Engineering Bureau of MOR |
|
|
Abstract Taking the construction experiences of 75. 5 m deep bored piles for the Mansion of Liao Chuang- Xi ng Financial Centre in Shanghai City as example,a special research problem on deep bored piles had been put forward- The main construction technique and methods for constructing these deep bored piles are introduced in this paper. The adopted measures for applying the stabiliced liquid method and for preventing inclined borehole and the landslide in borehole are also proposed, so as to guarantee the safety operation, rapid, high quality and to complete the project on time.
|
Received: 10 December 1999
|
|
|
|
|
|
|
|