|
|
RESEARCH ON FEASIBILITY OF DESIGNNING CABLE — STAYED BRIDGE WITH PC CONTINUOUS RIGID -STRUCTURE IN QUASI-HIGH-SPEED RAILWAY |
Pei Ruojuan |
Civil Engineering Dept. ? Central China Science and Engineering University,Wuhan |
|
|
Abstract Based on the space analysis of the China’s first cable—stayed bridge with double bridge tower built in the quasi—high—speed railway,this paper proposes a scheme of the ca?ble—stayed bridge with continuous rigid structure which consists of the fix—jointed bridge tower and girder,the fix—jointed bank pier and girder and the channeled box girders.
|
Received: 23 August 1995
|
|
|
|
|
|
|