The Scheme Research Integrating CTCS-2 and the Signaling Aspect Sequence Following British Standard |
ZHANG Minhui, FENG Mei |
China Railway Siyuan Survey and Design Institute Group Co. Ltd, Wuhan, Hubei 430063, China |
|
|
Abstract Research purposes: Signaling aspect following British standard is different from those following Chinese standard, not only in the ways of the shape and the size of the signal head, but also in the ways of the signal aspect, signal light color, signal indicator, the combination of the light color and the indicator, the signal aspect sequence approaching diverging junction. When CTCS-2 signaling system goes aboard and is needed to integrate with British signaling aspect, it is needed to define the design method to integrate it with British signal aspect, signal light color and the junction signal aspect sequence. Research conclusions: (1) The design method integrating CTCS-2 and the signaling aspect sequence following British standard includes: British-standard 4-aspects light signaling system should be chosen;The junction signaling aspect sequence should be chosen according to the principle of consistency of the ground code sequence, the moment getting the information indicating the diverging route no later than that of CTCS-2, or moment getting the information indicating the diverging route leading almost no unneeded braking;The ground code sequence should be adjusted accordingly, and the approaching controlling should be applied through decoding the certain ground code in certain condition and occupying-locking it;The MAY-FA4 or MAR can be adopted according to the speed limit of the diverging route. (2) The research results can provide reference for CTCS-2 outputting, its integration and localization with the British standard signaling aspect.
|
Received: 21 January 2022
|
|
|
|
|
[1] |
TB/T 3516—2018,CTCS-2级列控系统总体技术规范[S].TB/T 3516—2018,General Technical Specification for CTCS-2 Train Control System[S].
|
[2] |
Rail Industry Standard RIS-0703-CCS Issue:1.1.Signalling Layout and Signal Aspect Sequence Requirements[S]. Rail Safety and Standards Board Limited:2018.
|
[3] |
Rail Industry Standard RIS-0758-CCS Issue:1.1.Lineside Signal Aspects and Indications[S]. Rail Safety and Standards Board Limited:2018.
|
[4] |
TB/T 3060—2016,机车信号信息定义及分配[S].TB/T 3060—2016,Cab Signaling Message Definition and Allocaiton[S].
|
[5] |
胡永祥,王勇,刘文博. 高速铁路信号系统走向海外市场适用性探讨[J].铁路通信信号,2015(7):7-9.Hu Yongxiang, Wang Yong, Liu Wenbo. Adaptability Study of High-speed Railway Signaling System for Oversea Market[J]. Railway Signalling and Communication,2015(7):7-9.
|
[6] |
姚文华.英标联锁系统关键技术研究与实现[J].铁路通信信号,2017(1):6-9.Yao Wenhua. Research and Realization of Key Technologies of RGS-based Interlocking System[J]. Railway Signalling and Communication,2017(1):6-9.
|
[7] |
刘新乐.英国铁路保护区段的应用研究[J].铁路通信信号工程技术,2014(6):83-88.Liu Xinle. Utilization Research of the Overlap Section in British Raiway[J]. Railway Signalling & Communication Engineering,2014(6):83-88.
|
[8] |
冯梅. 中国铁路企业“走出去”技术标准应对措施研究[J].铁道工程学报,2017(6):88-93.Feng Mei. Research on the Correspondence Steps of Railway Technical Standards for Chinese Enterprises in the Process of “Going-out”[J]. Journal of Railway Engineering Society,2017(6):88-93.
|
|
|
|