Journal of Railway Engineering Society  2022, Vol. 39 Issue (4): 54-58    DOI:
Main Line: Communication Signals Current Issue | Archive | Adv Search |
The Scheme Research Integrating CTCS-2 and the Signaling Aspect Sequence Following British Standard
ZHANG Minhui, FENG Mei
China Railway Siyuan Survey and Design Institute Group Co. Ltd, Wuhan, Hubei 430063, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech