Abstract Research purposes: Based on the finite element theory and beam-rail interaction mechanism, taking a concrete deck arch bridge on railway as an example, this paper established a beam-rail interaction calculation model of deck arch bridge, and comprehensively analyzed the stress law of the continuous welded rail on bridge under different spans of the arch range. Considering the 10 m chord calculation results of track high-low line type, this paper put forward the design philosophy of railway continuous welded rail on the deck arch bridge. Research conclusions: (1) The best span arrangement of deck arch bridge is continuous beam. When the span of deck arch bridge is small, the setting of beam joint in the arch ring range is available to cancel the rail expansion joint. (2)Affected by temperature deformation of arch ring, the high and low chords calculation values of the beam joint in arch ring range change violently, where track geometry maintain is difficulty. (3) The rail expansion joint should avoid setting in the arch ring range, which is not allowed on the vault. (4) The research results can be applied to the design of railway continuous welded rail on the deck arch bridge, especially the setting of rail expansion joint.
|
Received: 20 June 2023
|
|
|
|
|
[1] |
刘辉,徐恭义.我国正在设计修建的特大跨度铁路桥梁及其技术特点[J].铁道工程学报,2007(9):22-26.Liu Hui, Xu Gongyi. Super Long Span Railway Bridges under Design and Construction in China and Their Technical Characteristics[J].Journal of Railway Engineering Society,2007(9):22-26.
|
[2] |
魏贤奎,王平.大跨度上承式钢管混凝土提篮拱桥桥上无缝线路计算分析[J].铁道标准设计,2010(11):1-3.Wei Xiankui, Wang Ping. Calculation and Analysis of Jointless Track on Long-span Deck Concrete-filled Steel Tubular Basket Arch Bridge[J].Railway Standard Design,2010(11):1-3.
|
[3] |
魏贤奎. 铁路拱桥上无缝线路纵向梁轨相互作用与地震反应分析研究[D]. 成都: 西南交通大学, 2014.Wei Xiankui.Research on Longitudinal Interaction Between Girder and Track and Seismic Response Analysis of Continuous Welded Rail on Arch Bridge[D]. Chengdu:Southwest Jiaotong University,2014.
|
[4] |
魏贤奎,王平. 铁路上承式拱桥梁跨及支座布置形式的影响研究[J] .铁道学报, 2013(9):100-106.Wei Xiankui, Wang Ping. Study on Influence of Span and Bearing Arrangements of Railway Deck Arch Bridge[J].Journal of the China Railway Society, 2013(9):100-106.
|
[5] |
颜乐,魏贤奎,王宇,等.拱桥上无缝线路计算软件开发及应用[J]. 铁道建筑,2014(5):126-130.Yan Le,Wei Xiankui,Wang Yu,etc.Development and Application of CWR Calculation Software on Arch Bridge[J].Railway Engineering,2014(5):126-130.
|
[6] |
TB 10015—2012,铁路无缝线路设计规范[S].TB 10015—2012,Code for Design of Railway Continuous Welded Rail[S].
|
[7] |
王小飞,张杰,周继,等. 山区铁路跨越V形峡谷桥梁方案比选研究[J]. 铁道标准设计,2022(3):89-94.Wang Xiaofei,Zhang Jie, Zhou Ji,etc.Research on Design Schemes for the Railway Bridge over V-shaped Gorge in Mountainous Area[J]. Railway Standard Design,2022(3):89-94.
|
[8] |
颜乐,魏贤奎,王平.大跨度上承式拱桥上无缝线路铺设方案研究[J]. 铁道标准设计,2013(11):6-10.Yan Le, Wei Xiankui,Wang Ping.Study on Laying Scheme of Continuous Welded Rail on Long-span Deck Arch Bridge[J].Railway Standard Design, 2013(11):6-10.
|
[9] |
刘文兵.大跨度提篮拱桥上无缝线路设计关键技术研究[J]. 铁道工程学报,2009(6):67-70.Liu Wenbing. Research on the Key Technologies for Design of Continuous Welded Rails(CWR) on Large-span Basket Handle Arch Bridge[J].Journal of Railway Engineering Society,2009(6):67-70.
|
[10] |
TB 10082—2017,铁路轨道设计规范[S].TB 10082—2017,Code for Design of Railway Track[S].
|
|
|
|