Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "P64":
99 ZHANG Han
  INFLUENCE OF COMPUTER’S DEFECT CONCERNED WITH THE YEAR 2000 AND ITS COUNTERMEASURES
    Journal of Railway Engineering Society   1999 Vol.16 (3): 99-102 [Abstract] (2477) 1 [HTML 1 KB] [PDF 228 KB] (151)
103 HUA Ling
  BUILDING OF TMN FOR THE 11TH ENGINEERING CONSTRUCTION GROUP
    Journal of Railway Engineering Society   1999 Vol.16 (3): 103-105 [Abstract] (2638) 1 [HTML 1 KB] [PDF 130 KB] (106)
106 ZHAO Hui-bing
  STUDY ON THE LAW OF PROBABILITY STATISTICS FOR OVER?EXCAVATING AND UNDER-EXCAVATING DURING CONSTRUCTION OF TUNNEL BY DRILLING AND BLASTING METHOD
    Journal of Railway Engineering Society   1999 Vol.16 (3): 106-110 [Abstract] (2502) 1 [HTML 1 KB] [PDF 247 KB] (218)
111 SUN JI-tang
  TUNNEL BLASTING DESIGN EXPERT SYSTEM
    Journal of Railway Engineering Society   1999 Vol.16 (3): 111-114 [Abstract] (2524) 1 [HTML 1 KB] [PDF 230 KB] (157)
115 CHANG Mian-sheng,CHEN Chang-zheng
  POWER SUPPLY AND DISTRIBUTION SCHEME DURING CONSTRUCTION AT ENTRANCE OF MIHUALING TUNNEL
    Journal of Railway Engineering Society   1999 Vol.16 (3): 115-118 [Abstract] (2523) 1 [HTML 1 KB] [PDF 188 KB] (66)
119 WEI Lan-fang,LI Wan-liang
  THINKING ABOUT INSTALLATION FOR TRACTION POWER RAILWAY SPECIAL IINES
    Journal of Railway Engineering Society   1999 Vol.16 (3): 119-121 [Abstract] (2504) 1 [HTML 1 KB] [PDF 177 KB] (172)
122 FAN Wei-li
  PRELIMINARY ANALYSIS ON DESIGN OF PILE BOX FOUNDATION FOR A HIGH MULTI STOREY BUILDING
    Journal of Railway Engineering Society   1999 Vol.16 (3): 122-125 [Abstract] (4803) 1 [HTML 1 KB] [PDF 194 KB] (150)
126 ZHONG Yu-lin
  DESIGN ON BUILDING OF SLAB COLUMN STRUCTURE WITHOUT COLUMN-CAP
    Journal of Railway Engineering Society   1999 Vol.16 (3): 126-129 [Abstract] (2490) 1 [HTML 1 KB] [PDF 209 KB] (176)
130 WEI Wei
  PRELIMINARY EXPLORATION ON ESTABLISHING A NEW RAILWAY CONSTRUCTION MANAGEMENT SYSTEM UNDER THE SOCIALISTIC MARKET ECONOMY CONDITIONS
    Journal of Railway Engineering Society   1999 Vol.16 (3): 130-133 [Abstract] (2479) 1 [HTML 1 KB] [PDF 222 KB] (117)
134 HAN Tong-yin,ZHANG Xian-feng,CHEN Feng-ping
  TO CREATE AN ENVIRONMENT FOR RAISING THE ENGINEERING QUALITY OF RAILWAY CONSTRUCTION
    Journal of Railway Engineering Society   1999 Vol.16 (3): 134-136 [Abstract] (2484) 1 [HTML 1 KB] [PDF 173 KB] (160)
58 FENG Ming-jun1,JU Xiao-hua2
  REINFORCING GROUND CREEP AT ENTRANCE OF TUNNEL BY PRESTRESSED ANCHOR CABLE
    Journal of Railway Engineering Society   1999 Vol.16 (2): 58-62 [Abstract] (4785) 1 [HTML 1 KB] [PDF 298 KB] (136)
67 SUN Bo
  ANALYSIS ON DEVELOPMENT OF LANDFORM FOR LOSESS LAND?SLIDE IN NORTHERN REGION OF SHANXI PROVINCE
    Journal of Railway Engineering Society   1999 Vol.16 (1): 67-71 [Abstract] (2534) 1 [HTML 1 KB] [PDF 296 KB] (248)
72 JIANG Zhongxin
  MECHANISM AND PRACTICE ON REINFORCING LOOSE BED LANDS、 LIDE WITH PRESTRESSED ANCHORING ROPE
    Journal of Railway Engineering Society   1999 Vol.16 (1): 72-77 [Abstract] (2491) 1 [HTML 1 KB] [PDF 410 KB] (254)
78 XIE Xiuqi,WEI Hong,SHI Shengguo
  DIVISION ON THE MOUNTAIN SLOP DEBRIS FLOW RISKS ALONG RAILWAY
    Journal of Railway Engineering Society   1999 Vol.16 (1): 78-84 [Abstract] (2519) 1 [HTML 1 KB] [PDF 367 KB] (230)
86 FU Kailong, ZHOU Yu, WEI Zhengxiong, WANG Zhijun
  Karst Hydrogeological Characteristics and Construction Disease Analysis of a High-speed Railway Tunnel
    Journal of Railway Engineering Society   2023 Vol.40 (10): 86-92 [Abstract] (9) 0 [HTML 0 KB] [PDF 1851 KB] (5)
First page | Prev page | Next page | Last pagePage 4 of 4, 105 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech