Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U448.2":
41 LI Weidong
  Scheme Design and Research of the Main Bridge of Yicheng Hanjiang River Railway Bridge
    Journal of Railway Engineering Society   2023 Vol.40 (2): 41-46 [Abstract] (2633) 1 [HTML 1 KB] [PDF 1686 KB] (1126)
38 WANG Genhui, GAN Ziyu
  Theoretical Solution on Spatial Mechanical Properties of Trapezoidal U-shaped Girders
    Journal of Railway Engineering Society   2022 Vol.39 (9): 38-43 [Abstract] (3142) 1 [HTML 1 KB] [PDF 558 KB] (1911)
50 XU Hong, ZHOU Mi, WANG Yamei, XU Ruilong
  Research on the Construction Control of Arch Rib of Concrete-filled Steel Tube Stiff Skeleton Arch Bridge
    Journal of Railway Engineering Society   2022 Vol.39 (9): 50-55 [Abstract] (2964) 1 [HTML 1 KB] [PDF 675 KB] (1940)
61 ZHANG Haishun, CHEN Ningxian, TANG Yougang, HU Ruihai
  Reasonable Wall Thickness Calculation of Offshore Super-long and Large Diameter Permanent Steel Casing
    Journal of Railway Engineering Society   2022 Vol.39 (7): 61-67 [Abstract] (3474) 0 [HTML 0 KB] [PDF 987 KB] (1976)
73 ZHAO Zhijun
  Bending Test and Performance Evaluation of Medium and Low Speed Maglev Standard Box Girder
    Journal of Railway Engineering Society   2022 Vol.39 (2): 73-78 [Abstract] (2312) 0 [HTML 0 KB] [PDF 955 KB] (1880)
79 ZHOU Shuai, YU Peng, ZENG Yongping, XU Shengqiao, NIE Jianguo
  Reasonable Analysis Method of Steel-concrete Post-pouring Area of Straddle Monorail
    Journal of Railway Engineering Society   2022 Vol.39 (2): 79-84 [Abstract] (2321) 0 [HTML 0 KB] [PDF 893 KB] (1907)
57 BU Jian - qing,CUI Jin - can
  Impacts of Prestress Loss on the Deflection for Large - span Prestressed Concrete Continuous Girder Bridges
    Journal of Railway Engineering Society   2014 Vol.31 (7): 57-61 [Abstract] (2807) 1 [HTML 1 KB] [PDF 2705 KB] (352)
66 CHEN Ke-jian,LI Yong-le,LI Long,ZENG Yong-ping
  Research on the Stiffness Design and Its Value for Long Span Railway Steel Truss Cable-stayed Bridge
    Journal of Railway Engineering Society   2014 Vol.31 (3): 66-71 [Abstract] (2774) 1 [HTML 1 KB] [PDF 1906 KB] (481)
52 WU Da - hong,SONG Shun - chen,ZHANG Lei,XU Ping - wei
  Research on Several Problems in Designing the Short Tower Cable - stayed Bridge on Tianjin - Baoding Railway
    Journal of Railway Engineering Society   2012 Vol.29 (10): 52-56 [Abstract] (2742) 1 [HTML 1 KB] [PDF 484 KB] (131)
57 WANG Fei,TIAN Shan - po,ZHUO Yi
  Analysis of Stability of Long - span Continuous Rigid Frame Bridge with High Pier
    Journal of Railway Engineering Society   2012 Vol.29 (10): 57-62 [Abstract] (2616) 1 [HTML 1 KB] [PDF 507 KB] (435)
31 LIU Zhi—jun
  Reserch on Design and Construction of Long Connecting,High Pier,Large——span and Dissymmetry Continuous Rigid—Frame Bridge
    Journal of Railway Engineering Society   2010 Vol.27 (12): 31-36 [Abstract] (2624) 1 [HTML 1 KB] [PDF 584 KB] (177)
50 WU Zai—xin,HE Guo—jing,LUO Shi—dong,YAN Ai—guo
  Research on the Aseismic Behavior of Long—span Composite Bridge with Stiff Girder and Tender Arch
    Journal of Railway Engineering Society   2009 Vol.26 (9): 50-54 [Abstract] (2512) 1 [HTML 1 KB] [PDF 357 KB] (152)
39 YU Ming-qiu, ZHU Bing
  Traveling Wave Effect Analysis of Cable-stayed Bridge with Support System Based on More Incentives Dynamic Model
    Journal of Railway Engineering Society   2008 Vol.25 (11): 39-44 [Abstract] (2713) 1 [HTML 1 KB] [PDF 493 KB] (128)
39 HU Yong
  Design of Protective Removal Scheme of 5 Spans Arch Bridge
    Journal of Railway Engineering Society   2008 Vol.25 (9): 39-43 [Abstract] (2547) 1 [HTML 1 KB] [PDF 508 KB] (115)
48 LI Guo-cheng,CHENG Tao
  Gray Comprehensive Assessment For Health State of Reinforced Concrete Girder Bridge
    Journal of Railway Engineering Society   2008 Vol.25 (9): 48-51 [Abstract] (2597) 1 [HTML 1 KB] [PDF 317 KB] (99)
31 WANG Gui-chun, PAN Jia-ying
  The NoIllinear Analysis of Vehicle—induced Vibration of Railway Cable—Stayed Bridges with Long Span
    Journal of Railway Engineering Society   2008 Vol.25 (7): 31-35 [Abstract] (2662) 1 [HTML 1 KB] [PDF 381 KB] (145)
36 QI Xing-jun, LI Xiao-jun,TANG Hui
  Research on the Seismic Mitigation Control Algorithm for Cable 一 stayed Bridge
    Journal of Railway Engineering Society   2008 Vol.25 (7): 36-40 [Abstract] (2714) 1 [HTML 1 KB] [PDF 431 KB] (136)
45 HAN Ren-hai
  Calculations of Temperature Effect on Light Bent Pile Pier of Overhead Bridge and Braking Force of Vehicle for Light Rail .
    Journal of Railway Engineering Society   2008 Vol.25 (7): 45-48 [Abstract] (2564) 1 [HTML 1 KB] [PDF 376 KB] (131)
49 SHE Qiao-ning
  Designs and Constructions of Vietnamess Baicheng Bridge and Chinese Yamen Bridge
    Journal of Railway Engineering Society   2008 Vol.25 (7): 49-52 [Abstract] (2670) 1 [HTML 1 KB] [PDF 409 KB] (175)
49 CHEN Jun
  Design and Construction of Support for Excavation of Foundation Pit for Pile Cap of Cable-stayed Bridge under High Ground Water Level
    Journal of Railway Engineering Society   2008 Vol.25 (5): 49-52 [Abstract] (2655) 1 [HTML 1 KB] [PDF 380 KB] (144)
42 LI Xing-lin, LIAO Cheng-qiang
  Reinforcement Design of 160m Span Prestressed Concrete Continuous Rigid Frame Box Girder
    Journal of Railway Engineering Society   2008 Vol.25 (4): 42-46 [Abstract] (2524) 1 [HTML 1 KB] [PDF 523 KB] (129)
43 YAO Jun-sheng, XU Zhi-yan, REN Wei, CHEN Lie
  Overall Design of Variable Width Large-span Continuous Beam in Turnout Area of Hanjiang Bridge for Xiamen-Shenzhen Railway
    Journal of Railway Engineering Society   2008 Vol.25 (2): 43-46 [Abstract] (2543) 1 [HTML 1 KB] [PDF 340 KB] (187)
61 ZHANG Lei,LI Li,NIU Yuan-Zhi
  Bridgescape Design Study of Coalescent Towers Cable-stayed Bridge
    Journal of Railway Engineering Society   2007 Vol.24 (12): 61-63 [Abstract] (2674) 1 [HTML 1 KB] [PDF 437 KB] (101)
34 HU Yong
  Analysis of Linear Control of Main Beam of Partial Cable-stayed Bridge with Super Wide Deck
    Journal of Railway Engineering Society   2007 Vol.24 (9): 34-39 [Abstract] (2671) 1 [HTML 1 KB] [PDF 564 KB] (144)
31 CHEN Jian-feng, LI Hui-Jun, YUAN Ming, YOU Li-hui
  Design and Construction of Asymmetric Continuous Beam Bridge
    Journal of Railway Engineering Society   2006 Vol.23 (9): 31-35 [Abstract] (2556) 1 [HTML 1 KB] [PDF 320 KB] (180)
46 ZHANG Cheng-zhi, SHI Wen-sheng
  Treatment Measures and Experience in Making High Temperature Closure of Rigid Framed Continuous Girders
    Journal of Railway Engineering Society   2006 Vol.23 (7): 46-48 [Abstract] (2483) 1 [HTML 1 KB] [PDF 204 KB] (135)
59 LI Ke-yin, JI Xiao-jun
  Analysis of Temperature Effect on Control of Construction of Cable-stayed Bridge
    Journal of Railway Engineering Society   2006 Vol.23 (5): 59-62 [Abstract] (2665) 1 [HTML 1 KB] [PDF 406 KB] (154)
25 NING Gui-xia, KONG De-yan, XIE Zhi-yong
  Creep Effect Analysis of the Whole PC Box Girder for Railway Bridge
    Journal of Railway Engineering Society   2006 Vol.23 (3): 25-28 [Abstract] (2675) 1 [HTML 1 KB] [PDF 361 KB] (185)
29 ZHAO Yan-long, LIN Peng-zhen, LIU Feng-kui
  Mechanical Analysis of End Block of a Double-track Railway Box Girder During Construction
    Journal of Railway Engineering Society   2006 Vol.23 (3): 29-32 [Abstract] (2680) 1 [HTML 1 KB] [PDF 353 KB] (111)
16 WANG Xian-jun
  LATERAL DOUBLE MOMENT IN THIN-WALLED BEAM
    Journal of Railway Engineering Society   2005 Vol.22 (4): 16-19 [Abstract] (2575) 1 [HTML 1 KB] [PDF 0 KB] (69)
First page | Prev page | Next page | Last pagePage 1 of 2, 36 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech