Research on the Stiffness Design and Its Value for Long Span Railway Steel Truss Cable-stayed Bridge |
CHEN Ke-jian1,LI Yong-le2,LI Long2,ZENG Yong-ping1 |
1.China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Sichuan 610031,China;2.Southwest Jiaotong University,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes:The stiffness design parameters of most of long span railway steel truss cable-stayed bridges in safe operation are summarized firstly.Referring to current codes around the world,and considering stiffness characteristics of railway cable-stayed bridge,the stiffness indexes of long span railway steel truss cable-stayed bridges are discussed.Then,the dynamic responses of vehicles and bridge are calculated by the coupled vibration method of vehicle-bridge systems to explore the effect of depth-span ratio and width-span ratio.And the reasonable value ranges of the stiffness design indexes are presented for long span railway steel truss cable-stayed bridges.
Research conclusions:(1)According the existing long span railway steel truss cable-stayed bridges and current codes,considering the difference of loads,the requirement of vertical stiffness of long span railway steel truss cable-stayed bridges can be reduced to certain degree.The ratio of vertical deflection to span should be in the range of 1/500~1/800 for the design of long span railway steel truss cable-stayed bridges.(2)The ratio of lateral deflection to span at the design wind speed can be up to 1/1 000~1/2 000,the ratio of lateral deflection to span at the wind speed allowing train operation should be less than 1/4 000 according to the current code.(3)The ratio of truss height to span should betaken as 1/25~1/40,the ratio of truss width to span should be 1/25~1/35.(4)In this paper,the research results call provide the valuable reference for the design of long span railway steel truss cable-stayed bridge.
|
Received: 13 November 2013
|
|
|
|
|
[1]辛学忠,郭向荣。大跨度铁路桥梁刚度统一描述方法探讨[J].铁道工程学报,2007(1):82-86.
Xin Xuezlaong.Guo Xiangrong.Exploration on Unified Describing Method for Rigidity of Large-span Railway Bridge[J].Journal of Railway Engineering Society,2007(1):82-86.
[2]李小珍,强士中.大跨度公铁两用斜拉桥车桥动力分析[J].振动与冲击,2003(1):6-9,19,25.
Li Xiaozhen,QiangShizhong.Vehicle-Bridge Dynamic Analysis for Long Span Highway and Railway Bi- Purpose Cable-Stayed Bridge[J].Journal of Vibration and Shock,2003(1):6-9,19,25.
[3]程国庆,潘家英.大跨度铁路斜拉桥竖向刚度分析[C]//全国桥梁结构学术大会论文集.武汉:同济大学出版社,1992.
Cheng Guoqing,Pan Jiaying.Long-span Railway Cable-stayed Bridge Vertical Stiffness Analysis[C]//National Academic Conference Proceedings of Bridge Structure.Wuhan:tongji University Press,1992.
[4] 高阳,曾庆元.钢梁横向刚度与行车安全[J].铁道建筑,1997(9):19-20.
Gao Yang,Zeng Qingyuan.Transverse Stiffness and Driving Safety of Steel Beam [J]. Railway Engineering,1997(9):19-20.
[5]铁建设[2007]47号,新建时速300~350公里客运专线铁路设计暂行规定[S].
Railway Construction[2007]No.47,The Temporary Regulations for the Designs of the Passenger Dedicated Railway with a Speed of 300 km/h to 350 km/h[S].
[6] 周诗广.大跨度桥上铺设无砟轨道结构设计研究[J].铁道标准设计,2011(3):1-5.
Zlaou Shiguang.Study On Structural Design of Ballastless Tracks Laid on the Long-span Bridges[J].Railway Standard Design,2011(3):1-5.
[7] 李小珍.高速铁路列车-桥梁系统耦合振动理论及应用研究[D].成都:西南交通大学,2000.
Li Xiaozlaen.High Speed Railway Train-Bridge System Coupling Vibration Theory and Application Research[D].Chengdu:Southwest Jiaotong University,2000.
[8]严国敏.现代斜拉桥[M].成都:西南交通大学出版社,1996.
Yan Guomin.Modern Cable—Stayed Bridges[M].Chengdu:Southwest Jiaotong University Press,1996.
[9]李永乐,蔡宪棠,安伟胜,等.大跨度铁路悬索桥结构刚度敏感性研究[J].中国铁道科学,2011(4):24-30.
Li Yongle,Cai Xiantang,An Weisheng,ere.Study on the Sensitivity of the Structural Stillness of Long-span Railway Suspension Bridge[J]. China Railway Science,2011(4):24-30.
[10]张强,李永乐,邓江涛,等.桁宽对大跨度铁路斜拉桥车-桥耦合振动性能的影响研究[J].桥梁建设,2012(1):19-23.
Zhang Qiang,Li Yongle,Deng Jiangtao,etc.Coupling Vibration of Long Span Railway Steel Truss Girder Cable-Stayed Bridge[J].Bridge Construction,2012(1):19-23.
[11]TB 10621—2009,高速铁路设计规范(试行)[S].
TB 10621—2009,Code for Design of High Speed Railway『S1.
|
|
|
|