Abstract:Based on the practical measurements during tunnel construct ion, the specimen parameters of over-excavating and under-excavating for E,IV﹠V scries of surrounding rocks arc obtained. The numerical characteristics and the probability distributions of over-excavating and under-excavating for different series of surrounding rocks are put forward through numerical and physical statistics and analyses.At the same time,the law of distribution of over-excavating and under-excavating at different portion on tunnel section for different series of surrounding rocks are also obtained,which may be used for controlling the quality of construction and taken as reference for researching the reliability of the tunnel Structure.
赵会兵. 钻爆法施工隧道的超欠挖概率统计规律研究[J]. 铁道工程学报, 1999, 16(3): 106-110.
ZHAO Hui-bing. STUDY ON THE LAW OF PROBABILITY STATISTICS FOR OVER?EXCAVATING AND UNDER-EXCAVATING DURING CONSTRUCTION OF TUNNEL BY DRILLING AND BLASTING METHOD. Journal of Railway Engineering Society, 1999, 16(3): 106-110.