Abstract:During construction of roadbed by filling the roadbed with fine sand on Tai′-Liaozhing Section of the Shen-Shan express way,the selection of construction machinery,the construction pro?cedure and the testing methods are introduced in this paper,as well as the problems which occurred usually in the working procedure and their treatment.
裴生艳,李燕龙. 粉细砂填筑路基施工[J]. 铁道工程学报, 1999, 16(4): 123-126.
PEI Sheng-yan,LI Yan-long. CONSTRUCTION OF ROADBED BY FILLING ROADBED WITH FINE SAND. Journal of Railway Engineering Society, 1999, 16(4): 123-126.