Abstract:Combined with the construction of the Qinling Tunnel and the Tatpingyi Head Drift in Sichuan Province, the author puts forward the systematical analysis and research on the mechanism, conditions,forecast and preventive methods for the rock burst occurred during the construction works. A series of effective solving measures are proposed. They may be applied effectively and useful as reference.
杨宝忠. 浅谈隧道施工中岩爆发生的机理及预防措施[J]. 铁道工程学报, 1999, 16(4): 62-65.
YANG Bao-zhong. PRELIMINARY TALKING ABOUT ROCK BURST OCCURRED DURING MEASURES OF CONSTRUCTION OF TUNNELS. Journal of Railway Engineering Society, 1999, 16(4): 62-65.