Abstract:Based on the authors personal experiences, a detailed description of hydrogeological work on Qinling extra-long tunnel from its subnnitial survey stage to the construction stage has been presented here. Meanwhile,the importance of synthetic hydrogeological work in the tunnel project has been emphasized also in the article.
石中平. 秦岭特长隧道水文地质工作综述[J]. 铁道工程学报, 2000, 17(1): 82-86.
SHI Zhong-ping. SUMMARY OF HYDROGEOLOGIC TUNNEL WORKS ON QINLING EXTRA-LONG. Journal of Railway Engineering Society, 2000, 17(1): 82-86.