Abstract:Research purposes: There are lots of equipments to be used during construction of urban mass transit. The national matching of interface among variable equipments or not is one of important influencing factors on combined equipment test and construction progress. One solution scheme to equipment interface is presented in this paper in order to solve the problems of equipment interface matching with high quality and efficiency.
Research methods: The concepts are defined to the equipment packed by object-oriented method, their equipment interface and matching by adopting information technology and parallel engineering principle, and the matching principle and process of equipment interface are described.
Research results: The equipment interface bank and experts supporting bank are set up and the framework of equipment interface management system is also set up in order to create coordinated working environment for all entities related to construction.
Research Conclusions: With his scheme, the equipments and their interface matching can be effectively planned, the equipment matching process can be controlled well, the experience of matching can be accumulated and the matching efficiency can be increased. At the same time, the gaps in space and time can be shortened greatly among all construction enterprises, and the uniform parallel management and real virtual combined test for equipment interface can be implemented.
丁烈云,顾曦,周迎. 基于接口库的城市轨道交通工程设备接口研究[J]. 铁道工程学报, 2006, 23(2): 5-10.
DING Lie-yun, GU Xi, ZHOU Ying. RESEARCH ON INTERFACE OF ENGINEERING EQUIPMENT FOR URBAN MASS TRANSIT BASED ON THE INTERFACE BANK. 铁道工程学报, 2006, 23(2): 5-10.
Aguinaldo Santos, James A. Powell, John Hinks. Using pattern matching for the international benchmarking of production practices[J]. Benchmarking: An International Journal, 2001, 8(1):35-47.