Research on the Compensation Modes of Parallel Reactor for Qinghai-Tibet Railway Continuous Power Cable Lines
WANG HAO1,YI Dong2
1. China Railway First Survey and Design Institute Group Ltd.,Xi'an, Shanxi 710043,China; 2. Southwest Jiaotong University , Chengdu, Sichuan 610031,China
Abstract:Research purposes : In order to guarantee the safety of power supply and train operation in Qinghai-Tibet Railway uninhabited zone, a continuous power cable lines were built from Tuotuohe to Naqu in addition to one 35 kV overhead line. The normal and fault current would be increased because of large phase-to-ground and phase-to- phase capacitor on power cable line. It becomes a prime question to minis the capacitance current, decides the compensation method and ensures the cable ends grounding mode.
Research conclusions: Through studying of two estimating method, it is fixed that capacitor per km of Qinghai-Tibet railway continuous power cable lines is between 0. 124 0~0. 133 1 uF, Then three compensation modes, namely, undercompensation, overcompensation and synthesized compensation are discussed through simulating and calculating to confirm whether it can satisfy the operating demands in all kinds of power transmission. A decision to adopt undercompensation was made to avoid resonance and lead to more fault. When overhead lines and cable lines run together, it has a little impact to the cable when overhead lines cast in, on the contrary, it has much more impact to the overhead lines when cable lines cast in, but it would be sustainable. After analyzed the over voltage,the conclusion of it would satisfy the system operational reliability and overvoltage needs if it adopted the undercompensation, both cable line end grounding method and reactor neutrality point grounding method. When one phase has a grounded fault, the other two phase voltage would turn into line voltage,just like the usual little current grounding system.
王颢,易东. 青藏铁路电缆贯通线并联电抗器补偿方式研究[J]. 铁道工程学报, 2008, 25(8): 67-70.
WANG HAO,YI Dong. Research on the Compensation Modes of Parallel Reactor for Qinghai-Tibet Railway Continuous Power Cable Lines. 铁道工程学报, 2008, 25(8): 67-70.