Abstract:Research purposes:The Chinese project valuation is in line with the international conventions gradually. Those unseasonable and uneasy to be followed terms and tabular formats have been revised in newly revised and implemented 2008 Valuation Code with Bill Quantity for Construction Works. In particular, the contents of how to prepare tender offer with bill quantity pricing and how to share the risks are added. This sets an even higher demands on construction enterprises in conducting the project cost prediction. However the currently common-used cost prediction method could not meet the development need completely, so the new method should be sought.
Research conclusions:Based on the international and domestic project valuations and the new demands of cost prediction, five methods for cost prediction in quantum are summed up, a program is designed for the cost prediction, and the new thoughts is presented on using the different methods for the projects with different composing elements. The verification shows the cost prediction methods presented in this paper can predict the project cost accurately and timely with a good applicable value.
吕铁生. 新清单计价模式下投标报价阶段的项目成本预测研究[J]. 铁道工程学报, 2009, 26(3): 100-104.
LV Tie-sheng. Research on the Prediction of Project Cost in Bidding Stage Based on New Bill Quantity of Construction Works. 铁道工程学报, 2009, 26(3): 100-104.