Abstract:Research purposes:Based on learning the advanced experience of foreign countries in construction cost management and in accordance with the real situation in China, this paper offers the relative measures for control of the railway construction cost to achieve the goal of "High efficiency and low cost".
Research conclusions:The following measures can be taken for control of railway construction cost: (1)The control of construction cost should be strengthened in design stage. (2)The active control of construction cost should be done, and the relation between technology and construction cost should be dealt with well through making economic and technical analyses and evaluations. (3)The life cycle cost of the project should be lowered, and the project investment scale should be controlled strictly to avoid unnecessary waste. (4) The legal person's responsibility system should be implemented. The legal person is responsible for the entire process from the project planning to funds collection, construction operation, paying the debt and value-keeping and value-increasing of assets. (5)The bidding system and supervision system should be implemented well, and the competition system should be introduced in the project management to choose highly qualified construction and supervision enterprises by establishing a set of relative systems. In addition, the contract management should be strengthened.
项 纯. 国内外工程造价管理情况分析与借鉴[J]. 铁道工程学报, 2009, 26(3): 105-109.
XIANG Chun. Analysis of Construction Cost Management in China and Foreign Countries. 铁道工程学报, 2009, 26(3): 105-109.