铁道工程学报  2009, Vol. 26 Issue (4): 71-75    
  路网研究 本期目录 | 过刊浏览 | 高级检索 |
北京南站综合交通枢纽地铁站预留改造方案研究
马 为,高 虹
铁道第三勘察设计院集团有限公司, 天津300251
Research on the Pre-reserved Upgrading Scheme for Subway Station in Beijing South Traffic Terminal
MA Wei, GAO Hong
Research purposes:The long-term expectation shows the subway in Beijing South Traffic Terminal will serve the 50% passengers from the railway, so the pre-reserved upgrading design of the subway station in Beijing South Traffic Terminal is essential to the terminal. This paper studies the pre-reserved upgrading scheme for the subway station and recommends the upgrading scheme for achieving the goal of passenger transferring from railway to subway with convenience and high efficiency.
Research conclusions:By discussing and studying the design of pre-reserved upgrading scheme for the subway station in Beijing South Traffic Terminal, this paper offers two upgrading schemes for subway station, namely prolonging the total length of the platform and prolonging the platform length in part. After verification and analyses, it is believed prolonging the total length of the platform is better than prolonging the platform length in part for an island-type station.

版权所有 © 2014 《铁道工程学报》编辑部
京ICP备14038223号
本系统由北京玛格泰克科技发展有限公司设计开发