Research on the Scheme for Leading Longkou-Yantai Railway into Yantai Region
WANG Qing-hui1, SUN Zhao-wu1, WANG Gang2
1. Jinan Design Institute, China Railway Engineering Consultant Group, Jinan, Shandong 250022,China; 2. China State Construction Engineering Corp. Ltd, Beijing 100044, China
Abstract:Research purposes:This paper describes the existing railway profile and the general near-term and long-term railway plan of Yantai region, and researches the railway arrangement in Yantai region after leading Longkou-Yantai Railway into Yantai region for the purposes of enhancing the carrying capacity of the block section and reducing the cross interference among the tracks.
Research conclusions:With completions of Dezhou-Longkou Railway, Qingdao-Weihai Intercity Railway, Lancun-Yantai Electrified Railway and the second line of Dezhou-Longkou Railway and leading them into Yantai region in the near future or in future, the railway crossing pattern with two double -track main lines, one intercity railway and one double track feery railway will be formed in Yantai region. In the near future, the Longkou-Yantai Railway will be led into Fushan Station to remain Zhuji Block Postand drawn forth through the turnout 18 of Yantai-Daliang Feery Railway to connect with Yantai-Daliang Feery Railway and cross over the Lancun-Yantai railway in the middle part. After completion of the second track of Longkou-Yantai Railway in future, the Zhuji Sourth Railway Station will be built instead of Zhuji Block Post and it will have five main lines from the Longkou-Yantai Railway, the Yantai-daliang Ferry Railway and Lancun-Yantai Railway. Also the Longkou-Yantai Double-track Railway and Lancun-Yantai Single-track Railway will be led into the Zhuji Station.
王庆辉;孙 召;王 刚. 龙烟铁路引入烟台地区方案研究[J]. 铁道工程学报, 2010, 27(3): 7-10.
WANG Qing-hui, SUN Zhao-wu, WANG Gang. Research on the Scheme for Leading Longkou-Yantai Railway into Yantai Region. 铁道工程学报, 2010, 27(3): 7-10.
Li Zhaoyang. Feasibility Research on Qingdao-Rongcheng Newly-built Railway [Z]. Tianjin: The Third Railway Survey and Design Institute Corporation,2009.
Xie Haihong, Zhou Langya, Yang Lijuan. Scheme Choice for Introducing Passenger Dedicated Line into Railway Hub[J]. Journal of Beijing Jiaotong University, 2008(3): 6 -10.
[ 6 ] 辛灵.客运专线引入枢纽相关问题研究[D].成都:西南交通大学, 2008.
Xin Ling. Study on Related Problems of Introducing Passenger Dedicated Line into Railway Terminal[D]. Chengdu: Southwest Jiaotong University, 2008.
[ 7 ] Ricardo Mateus, J. A. Ferreira, Joao Carreira. Multicriteria decision analysis (MCDA): Central Portohigh-speed railway statlon[J]. European Journal of Operational Research, 2008(187): 1 -18.