研究结论:溶腔顶板厚度为 30 m 和 25 m 时, 桥基附近岩体安全系数均在 1.2以上, 溶腔顶板安全系数在1.3以上, 溶腔顶板是安全的; 溶腔顶板厚度 20 m 时, 溶腔洞周局部岩体安全系数约 1.1, 溶腔顶板基本是安全的, 但岩体强度储备不足。本工程桥基荷载作用下溶腔顶板最小安全厚度约为 20 m, 对应基础最大埋深为13 m; 基础设计埋深为 8 m, 溶腔顶板是安全的。
Abstract:Research purposes:Taking a bridge on one passenger dedicated line in karst area as an example and combining with the distribution pattern of the real space of karst cavity, the stress characteristics of rock mass under bridge load was analyzed with three-dimensional finite element to determine the safe roof thickness of karst cavity. The results could provide the reference to the design of bridge foundation of high speed railway in karst area.
Research conclusions: The safety coefficient of rock m ass nearby the bridge foundation was over 1.2 and the safety coefficient of the roof of the karst cavity was over 1.3 when the safe roof thickness of karst cavity was 30m or 25m, so the roof of karst cavity was in safety. The safety coefficient of local rock mass around the karst cavity was about 1.1 when the safe roof thickness of karst cavity was 20m, so the roof of the karst cavity was basically in safety, but the stored strength of rock mass was insufficient. The minimum safe roof thickness of karst cavity under bridge load presented in this paper was about 20m and the maximum buried depth of bridge foundation was 13m while the design buried depth was 8m, therefore, the roof of karst cavity was in safety.
Huang Longfei, Chang Zaiqing, Zhao Xifeng. Construction Technique for Pile Foundation in Karst Area[J]. Journal of Railway Engineering Society, 2007(Supplement 1): 27-30.
Fu Junqiang. Accident Analysis and Protection Treatment of Bridge Pile Project in Karst Area[J]. Communication Science and Technology, 2003(1): 212-215.
Xiong Liang, Yin Feng. Foundation Design and Construction Technology of Railway Bridge in Karst Area[J]. Journal of Railway Engineering Society, 2009(3): 23-26.