摘要研究目的:采用车- 桥系统相互作用的计算模型, 对铁路双线连续梁桥竖向有载自振频率进行了理论推导, 并计算了两列20辆相同参数的提速客车从桥梁的两端同时通过40 m + 4 x 72 m + 40 m 部分预应力混凝土连续箱形梁桥时, 车- 桥系统的竖向有载自振频率。为进一步研究多线铁路桥梁竖向有载自振频率和振动响应等提供参考。
Abstract:Research purposes: The vert ical load - carry ing frequency of ra ilw ay doub le- track con tinuous bridge is derived in theory w ith the mode l for calcu lation of the interaction of vehicle- bridge system, and the vertica l loadcarrying frequencies of the veh icle- bridge system is calcu lated when tw o speed- ra ise passenger tra ins respectively composed o f tw enty coaches w ith the sam e cond itions passing through some parts of pre- stressed concrete continuous box- g irder bridge at 40m + 4 x 72 m+ 40 m from both ends of the bridge for the purpose o f prov id ing the reference to study ing the vertical load- carrying frequency and vibration response o fmult ip le- track railw ay bridge .
Research conclusions: The change regularity o f the vertica l load - carry ing natura l frequency o f th is double- track continuous bridge w ith tw o tra ins on it is sim ilar to that o f sing le- track simp ly- supported bridge and that of th is bridge w ith one tra in on i.t The vertica l load - carry ing frequency of this bridge can be rep laced by its na tura l frequency,w ithout obv ious error. If the vert ica l load- carry ing frequency should be calcu lated, it can be rep laced by the average value.
Railway Transpor tation Han [ 2004] No. 120, Code for Rating Existing Railw ay Bridges[ S].
[ 2] Jianzhong L,iMubiao Su. The Resonant V ibration for a Simply Supported G irder Br idge Under H igh – speed Tra ins [ J] . Journal of Sound and V ibration, 1999( 5):897- 915.
Yang Shiruo, Zeng Q ingyuan. Ana lysis of Dynam ic Response of Steel Truss Girder Bridge When Train Passing [ J]. Journal of Railway Engineering Society, 2010( 7): 48- 51.
Ren Jianying, Su Mubiao, LiW enping, etc. Study on Vertical Loaded Free Frequenc ies of Railw ay Continuous Bridges[ J]. Journa l of the China Railw ay Socie ty, 2005( 5): 111- 116.
R en Jianying, LiW enping, SuMubiao. A Study of the Vertical - loaded Free Frequencies of the Railw ay Continuous Pre - stressed Concrete Br idges [ J ].Journal of N ational D efence Traffic Engineer ing and Technology, 2004( 5) : 24- 25.
Ren Jianying, Su Mubiao, Li W enping. Study on Vertical Loaded Free Frequencies ofRa ilway Stee lTruss Continuous Br idge [ C ] / /The P roceedings of the 13th Nationw ide Structura l Engineering Academic M eeting.Beijing: Tsinghua University P ress, 2004: 371- 376.
[ 7] 王福天. 车辆动力学[M ]. 北京: 中国铁道出版社, 1983.
W ang Futian. V ehicle D ynamics[M ]. Be ijing: China Railway PublishingHouse, 1983.
[ 8] 蒋存煜. 有限元基础[M ]. 北京: 清华大学出版社, 1984.
Jiang Cunyu. The Basis of F inite Element [ M ].Beijing: Tsinghua University P ress, 1984.
Su M ubiao, L i Jianzhong, Liang Zhiguang. Study on Vertical Loaded Frequenc ies of Railway Simply Suppor ted Beam Br idges [ J] . Journal of the China R ailway Society, 2001( 2): 76- 80.