Abstract:Research purposes: As passenger- ded icated line construction project has the characteristics of grand scale,long construct ion period and enormous investm en,t it has the big and indeterm inate risk caused by the irresistib le factor and contretemps. Th is paper studies the risk characterist ics, r isk e ffec,t risk contro l characterist ics and risk contro l methods of passenger- ded icated line construction pro jec,t and discusses the risk contro l of passenger- ded icated line construction pro jec.t
Research conclusions: The risk characterist ics o f passenger - dedicated line construct ion pro ject dec ides that the systematic and dynam icmethodmust be used for the risk contro.l The ob ject ivemanagementm ethod is basicmethod for the risk contro.l W ith our practice c losing to the in ternational conven tiona l pract ice, the risk of passenger- dedicated line construction projectmay be avoided and d iverted by the pro ject insurance and otherw ays.
崔丽红. 客运专线建设项目风险管理问题的研究[J]. 铁道工程学报, 2011, 28(1): 96-98.
CUI L i- hong. Research on Risk Control of Passenger- dedicated Line Construction Project. 铁道工程学报, 2011, 28(1): 96-98.
Hao Zhibin. Problem Investigation on R isk M anagement of Highroad Engineering Construct ion Project [ J ]. C ity R oad - bridge and Countercheck F loodwater, 2006( 4): 129- 131.
[ 3] 雷胜强. 国际工程风险管理与保险[M ]. 北京: 中国建筑工业出版社, 1996.
Lei Shengqiang. Interna tiona l Engineering R isk M anagement and A ssurance [ M ]. Be ijing: China Construc tion Industry Publishing Company, 1996.
Liu Y isheng, etc. The Researches on TheM anagement Modes of R ailway P roject in China [ J]. Journal of Railway Engineering Society, 1998( 1): 65- 69.
Peng Jingshu. Elementary Introduction on Quality Control in Construction Stage for Engineer ing Projec ts [ J]. Journa l of Railw ay Engineering Society, 2001( 4):61- 63.