Abstract:Research purposes: How to scientifically and effectively manage the railway engineering project is crucial to the quality of the railway engineering. By adopting the traditional management mode,the engineering quality can be guaranteed in a certain sense,but there are still some problems,such as over investment,over scale,over standard,no supervision and over intervention by government. In this paper,based on the analysis of the these problems,the thoughts on the system - engineering - based closed loop management mode for the railway engineering project is offered.
Research conclusions: Based on the traditional management mode of design,bidding and building ( DBB) ,the thoughts on the system - engineering - based closed loop management mode for the railway engineering project includes the following seven management elements: the project approval, index design, bidding, engineering management,engineering supervision management,works acceptance and project evaluation. Based on this mode,the all roles related to in this management mode are sorted. The management of the railway engineering project is a complicated systematic engineering. Only one management mode can not cover and contain everything and the relatives managements are needed. This research result is of the great significance to the management of the railway engineering project.
杨亚伟. 基于系统工程的铁路工程项目闭环管理模式研究[J]. 铁道工程学报, 2011, 28(5): 106-109.
YANG Ya - wei. Research on System - engineering - based Closed Loop Management Mode for Railway Engineering Project. 铁道工程学报, 2011, 28(5): 106-109.
Chen Jingang. The Thought of Increasing Management of Railway Construction Projects [J ]. Railway Engineering Enterprises Management,2002( 2) : 41 - 43.
Li Bingtai. Preliminary Talking about Several Understanding on Management of Construction Projects [J]. Journal of Railway Engineering Society,2000( 1) : 198 - 121.