Abstract:Research purposes:The key technologies related to the excavation method,preliminary bracing,monitoring and secondary lining are discussed and analyzed for providing the reference to the similar works.
Research conclusions:To the tunnel with soft - weak surrounding rock,the step excavation method should be adopted,the preliminary bracing should be conducted as early as possible and the closure to form a loop should be done as early as possible to improve the loading structure of the surrounding rock. The coordination between the design and construction should be strengthened. The displacement during construction should be monitored to know the change regulation of the displacement,so the design parameters can be adjusted dynamically and the time of laying the secondary lining can be adjusted.If necessary,the inverted arch and the secondary lining should be done immediately to ensure the security of the tunnel construction.
张永强. 论喷锚构筑法在软弱围岩隧道施工中的应用[J]. 铁道工程学报, 2011, 28(7): 99-104.
ZHANG Yong - qiang. Application of Shotcrete and Anchorage Support in Construction of Tunnel with Soft - weak Surrounding Rock. 铁道工程学报, 2011, 28(7): 99-104.
Cao Xiaolin. Control of Distance between Secondary Lining and Excavation Face in Highway Tunnel Construction [J].Journal of Railway Engineering Society ( Supplement) ,2011(S) :51-54.