Abstract:Research purposes:According to the survey of the small一sized mined一out region of the Shangzhichang Mine along the Shanghai一Kunming Railway , this paper introduces the survey methods for the small一sized mined一out region,discusses the methods for analysis of the stability of small一sized mined一out region,gives the disposal ideas on the railway engineering and summarizes the experiences of railway crossing the small一sized mined一out region for providing the reference to the similar works.
Research conclusions:(1)For the small一sized mined一out region,the survey should be conducted from the big area to small area for knowing the overall condition of the mined一out region in macroscopic view first and then studing the area where has impact on the railway construction.(2)For the survey,first of all,the geological survey should be conducted,then the geophysical prospecting should be conducted and finally the exploration drilling should be conducted for verification, supplement and combination each other.(3)The key points of the survey should be made clear and appropriate method for the stability assessment should be chosen according to the different types of the mined一out region and the engineering features.(4)With the roof collapse blocking up method and the manual method,the checking calculation was made for the stability of the mined一out region. From the calculation result,it was concluded it was unnecessary to treat the mined一out region of Shangzhichang Mine.
刘 熙;张 昆;李晓凡. 铁路穿越小型采空区稳定性的评价方法研究[J]. 铁道工程学报, 2012, 29(12): 32-35.
LIU Xi,ZHANG Kun,LI Xiao—fan. Research on the Assessment Method for Stability of Railway Crossing Small—sized Mined—out Region. 铁道工程学报, 2012, 29(12): 32-35.
TB 10027--2001.Code for Unfavorable Geological Condition Investigation of Railway Engineering[S].
[2] TB 10012--2007,铁路工程地质勘察规范[s].
TB 10012--2007,Code for Geology Investigation of Railway Engineering[S]. CB 50021—200l,岩土工程勘察规范[s].
[3] GB 50021—2001.Code for Investigation of Geotechnical Engineering[S].
[4] 铁道部第一勘测设计院.铁路工程地质手册(修订版) [M].北京:中国铁道出版社,1999.
China Railway First Survey and Design Institute Group Ltd.Railway Engineering Geology Handbook(Revised Edition)[M].Beijing:China Railway Publishing House,1999.
State Bureau of Coal Industry. Buildings,Water Bodies,the Railroad and the Main Road way of Coal Pillars and Mining Rules[M].Beijing:Coal Industry Publishing House,2000.
Wang Maojing,Subsid Ingme Chanism and Safety Evaluation of the Coal[一mining Area for Dongying Extended Railway Line in Jiao—Ji Railway Line[J]. Journal of GeologicaJl Hazardsand Environment Preservation,2004(2):17—22.
[7] 时环生,田德铁路小龙煤矿采空区的地质选线[J].铁道工程学报,2007(9):14—16.
Shi Huansheng.The Geological Route Selection of Tiandong—Debao Railway in Depletion Region of Xiaolong Coal Mine[J].Journal of Railway Engineering Society,2007(9):14—16.