Abstract:Research purposes: The study is done on the schemes for leading passenger dedicated line into existing large - scale terminal and the analysis is made for the structure,orientation and function of the passenger transport system in the terminal so as to determine a reasonable leading - in scheme. By the analysis and research on the optional schemes for leading Harbin - Mudanjiang Passenger Dedicated Line into Harbin terminal ,the recommended scheme is proposed and it can be as the reference to the similar work.
Research conclusions:(1) When the study is done on leading passenger dedicated line into an existing terminal,the layout of existing railway terminal,the planning for the passenger transport system in the terminal and main traveling directions of passenger flow shall be taken into account to choose the reasonable leading - in route and make full use of the existing route as much as possible for reducing separation of the city. (2 ) Based on the analysis of the general planning of the Harbin terminal,the engineering and technical conditions and engineering implementation difficulty as well as the coordination with urban planning ,it is recommended to lead the Harbin - Mudanjiang Passenger Dedicated Line into Harbin West Station along the existing route after making the demonstration in many ways and aspects and the economic comparison and selection.
卢茂胜. 哈牡客运专线引入哈尔滨枢纽方案研究[J]. 铁道工程学报, 2012, 29(6): 88-91.
LU Mao - sheng. Study on Scheme for Leading Harbin - Mudanjiang Passenger Dedicated Line into Harbin Terminal. 铁道工程学报, 2012, 29(6): 88-91.
[1] GB 50091—2006,铁路车站及枢纽设计规范[S]. GB 50091—2006,Code for Design of Railway Station and Terminal [S].
[2] 铁道第四勘察设计院. 站场及枢纽[M]. 北京:中国铁道出版社,2004. China Railway Siyuan Survey and Design Group Co. Ltd. Station,Yard and Terminal [M]. Beijing: China Railway Publishing House,2004.
[3] GB 50090—2006,铁路线路设计规范[S]. GB 50090—2006,Code for Design of Railway Line[S].
[4] TB 10067—2000,铁路站场客货运设备设计规范[S]. TB 10067—2000, Code for Design of Passenger & Freight Equipments for Railway Station and Yard[S].
[5] TB 10621—2009,高速铁路设计规范(试行)[S]. TB 10621—2009, Code for Design of High Speed Railway[R].
[6] 铁道第三勘察设计院. 哈尔滨至牡丹江铁路客运专线工程可行性研究报告[R]. 天津:铁道第三勘察设计院,2009. The Third Railway Survey and Design Institute Group Corporation. Engineering Feasibility Study Report on Harbin - Mudanjiang Railway Passenger Dedicated Line [R]. Tianjin:The Third Railway Survey and Design Institute Group Corporation,2009.
[7] 彭齐渊,王慈光. 铁路行车组织[M]. 北京:中国铁道出版社,2007. Peng Qiyuan,Wang Ciguang. Railway Train Operation Organization[M]. Beijing: China Railway Publishing House,2007.
[8] 铁道第三勘察设计院. 哈尔滨枢纽总图规划[R]. 天津: 铁道第三勘察设计院,2008. The Third Railway Survey and Design Institute Group Corporation. Master Plan of Harbin Terminal[R]. Tianjin:The Third Railway Survey and Design Institute Group Corporation,2008.
[9] 中铁第一勘察设计院集团有限公司. 新建哈尔滨西站工程初步设计[R]. 西安:中铁第一勘察设计院集团有限公司,2008. China Railway First Survey and Design Group Co. Ltd. Preliminary Design of Newly - built Harbin West Station Project[R]. Xi’an: China Railway First Survey and Design Group Co. Ltd,2008.
[10] 哈尔滨铁路局哈尔滨西客站建设工程指挥部. 新建哈尔滨西客站指导性施工组织设计[R]. 哈尔滨:哈尔滨铁路局哈尔滨西客站建设工程指挥部,2010. Harbin West Station Project Construction Commanding Department of Harbin Railway Bureau. Construction Organization Design Guideline for Newly - built Harbin West Station[R]. Harbin:Harbin West Station Project Construction Commanding Department of Harbin Railway Bureau,2010.
[11] 罗永利. 青连铁路引入青岛枢纽方案研究[J]. 铁道工程学报,2011(4):1 -4. Luo Yongli. Reseach on Schemes of Leading Qingdao - Lianyungang Railway into Qingdao Junction Terminal [J]. Journal of Railway Engineering Society,2011(4): 1 - 4.