Abstract:Research purposes:In recent years,with increase of construction of a variety of continuous beam and simply supported beam bridges,how to quickly,standardizedly and economically construct such kind of the bridges becomes the very important. Taking the bridge erecting machine used for the north bridge approach of the Taohuayu Yellow River bridge as an example,the study was done on the construction method for segmental assembling construction by using the assembled bridging machine in order to ensure the construction schedule and save the construction cost.
Research conclusions:The model was established to analyze the structure of the assembled bridge erecting machine.The analysis results showed that the structure of the bridge erecting machine could meet the construction requirements,and its stiffness was stronger than standard bridge erecting machine by about 1. 5 times. With full use of the existing member bars for the this bridge erecting machine,the investment in manufacturing new kind of member bars was much reduced and the cost was saved by 50% . The bridge erecting machine runs on the slide board with the features of smooth running,easy operation,safety and reliability.It can provide the reference to similar works.
[2] 高智神,周璞.采用桁架式架桥机架设 64 m 简支梁的施工技术[J]. 桥梁建设,2002(4) :69-71.
Gao Zhishen,Zhou Pu. The Use of Truss Erecting Machine Erected 64 m Simply Supported Beam Construction [J].Bridge Construction,2002(4) : 69-71.
[3] 杜健. 白马河特大桥边跨上部结构64 m 混凝土简支箱梁施工技术[J].桥梁建设,2006(S1) :63-65.
Du Jian. Bai Man River Bridge Movement in the Structure of the Department 64 m Concrete Simply Supported Box Girder Construction Technology[J]. Bridge Construction,2006(S1) : 63-65.
Ma Tao,Ren Xuchu. Machine Design and Construction of the White Horse River Bridge MZ64 /3200 Type Bridge[J]. Western Exploration Engineering,2010 (12) :178-181.