Abstract:Research purposes:Shenzhen Chegongmiao integrated transport hub is the passenger integrated transport hub which set 4 rail transportation,conventional public transportation,rental and social vehicles as a whole.The hub has many urban rail transit lines,large scale,complex passenger flow organization,many surrounding environment control factors,the project is difficult to implement.In this paper,through the analysis of Chegongmiao hub from the initial planning to study layout line,the writer proposed some methods and ideas about how to do research on line layout of large orbit traffic hub.so as to provide reference for similar engineering.
Research conclusions:Research of large hub of rail transit is a process that involves many fields,many control factors, engineering complex,also is a macro to micro process.For large rail transport hub should increase research investment in the early planning.to determine the feasibility of its function and its implementation as soon as possible,the later location adjustment is likely to cause the corresponding transformation project,increase the project implementation difficulty and investment,and make the defect on function of use.At the same time,line layout of large hub inner orbit traffic are complex.the spatial relationship between the hub and line and before and after the interval should be dealed with for meeting the needs of the passengers at maximum limit,analysis and study for a variety of possible layout should be carried out,strive to be comprehensive,in order to get the most reasonable layout scheme.
苟波. 深圳市车公庙综合交通枢纽线路布局方案研究[J]. 铁道工程学报, 2013, 30(12): 85-88.
GOU BO. Research on the Line Layout Planning of Shenzhen Chegongmiao Intergrated Transport Hub. 铁道工程学报, 2013, 30(12): 85-88.
China Railway Eryuan Engineering Group Co.Ltd. The Feasibility Study Report of Shengzhen City Metro Line 11[R]. ChengDu:China Railway Eryuan Engineering Group Co.Ltd,2011.
China Railway Eryuan Engineering Group Co.Ltd. The Feasibility Study Report of Che Kung Temple Comprehensive Transportation Hub Project[R]. ChengDu:China Railway Eryuan Engineering Group Co.Ltd,2011.
[4] 杨立新.综合交通枢纽布局设计研究[J].城市轨道交通研究,2011(9):9-13.
Yang Lixin.On Transport Hub Layout Design[J]. Urban Mass Transit,2011(9):9-13.
[5]李筱毅,潘威.大型综合交通枢纽建设思考[J].都市快轨交通,2012(2):36-40.
Li Xiaoyi,Pan Wei.Considerations about a Comprehensive Traffic Hub Construction[J].Urban Rapid Rail Transit,2012(2):36-40.
[6] 柴家远.大型复杂地下空间总体设计研究[J].铁道工程:学报,2012(7):77-81.
Chai Jiayuan.Research on Overall Design of Large- scale Complex Underground Space[J].Journal of Railway Engineering Society,2012(7):77-81.