Abstract:Research purposes:The Chongqing - Guizhou railway is a line for the mixed passenger and freight traffic, and is an important part of the convenient,rapid,large capacity channel from the Sichuan,Chongqing and the northwest area to the Guizhou, Guangxi, Hainan, Guangdong areas. The line needs to access into the Guiyang hub in the northern city and the passenger train of the railway accesses into the Guiyang Bei Station. But where does the freight train access into the Guiyang hub is the urgent problem to be solved because it relates to the disturbance level to the city planing and the construction investment. This paper compares and analyzes the two optional plans of accessing the freight train into the Dulaying Station via connecting line and accessing the fright train into the existing Sichuang - Guiyang Railway via connecting line to determine the more reasonable plan.
Research conclusions:From the analysis of the line direction of the Chongqing - Guiyang Railway after it accessing into the Guiyang hub,it is concluded : ( 1) The plan for the freight train of the Chongqing - Guiyang Railway accessing into the Guiyang hub should consider the demands of the upgrading of the existing railway line to reduce the abandon projects in long — term future. (2) The plan for the fright train accessing into the existing Sichuang - Guiyang Railway via connecting line can save the construction investment and has a good coordinations with the projects in the near future and long - term future. (3) This research can provide the reference to the similar works.
李杰,姚传开. 渝黔引入贵阳枢纽货车下线疏解方案研究[J]. 铁道工程学报, 2013, 30(6): 69-72.
LI-Jie,YAO Chuan-kai. Research on Untwining Plan for Freight Train of Chongqing - Guizhou Railway Accessing into Guiyang Hub. 铁道工程学报, 2013, 30(6): 69-72.
GB 50091-2006,Code for Design of Railway Station and Terminal [S].
[3]铁建设[2007]47号,新建时速300?350公里客运专线 铁路设计暂行规定[S].
Railway Construction [ 2007 ] No. 47,The Temporary Regulations for the Designs of the Passenger Dedicated Railway with a Speed of 300 km/h to 350 km/h [S]
The Fourth Survey and Design Institute of China Railways. Railway Engineering Technical Manual - Station and Yard and Terminal [ K ]. China Railway Publishing House,2004.
Huang Fuqiang. Analysis and Thoughts on Constrution Plan of Nanjing Station and Yard Upgrading Engineering [ J ]? Shanghai Raiyway Science &TechnoIogy, 2005(6):9 -10.
China Railway Eryuan engineering Group Co. Ltd. Feasibility Preliminary on Newly - built Chongqing - Guiyang Railway [R]. Chengdu : China Railway Eryuan engineering Group Co. Ltd,2012.
[11]金武.浅谈蚌埠站站场改造施工方案[J].上海铁道科 技,2005(3) :31 -32.
Jin Wu. Discussion on Construction Plan fou Station and Yard Upgrading in Benbu Station [ J ] . Shanghai Raiyway Science &Technology, 2005(3) :31 -32.
Study on the Plane Layout of Hezhou Railway Station of Guizhou - Guangzhou Rapid 一 speed Railway [ J ] . Journal of Railway Engineering Society,2010(2) :89 - 92.