Abstract:Research purposes: With the powerful development of the urban rail transit, three are more and more new tracks to cross the existing track engineering. However,it is difficult for the traditional construction technology to control the settlement of the existing structures and it needs higher cost. In this paper, combined with the construction of the Gongzhufen Station of the Line 10 of Beijing metro to under - cross the Gongzhufen Station of the Line 1,the introduction is given to the construction technology that is available for effective control of the settlement of the existing structure with the appropriate cost to provide the reference to the similar works.
Research conclusions : (1) The settlement of the bottom plate structure of the existing station is affected by the release of stress of the working face, the disturbance to bottom during excavation,the excavation height,the long closure time of the primary support structure and no timely jacking of the jack,and the release of the stress of the working face is the main reason for the settlement of the existing structure. (2) The settlement of the existing structure can be effectively controlled by taking the measures of adding the temporary columns and jacks,reinforcing the foundation base with steel frame, grouting to the back of the primary support with extreme fine cement paste and jacking up by jacks, and the jacking up by the jacks is the most powerful means to control the settlement. (3 ) The CRD + top brace control technology is available for effective control of the settlement of the existing station and meet the settlement of 3 mm.
陶连金,李积栋,汪国峰. CRD+顶撑控制技术在密贴下穿工程中的应用[J]. 铁道工程学报, 2013, 30(7): 74-79.
TAO Lian-jin,LI Ji-dong,WANG Guo-feng. Application of CRD + Top - bracing Control Technology in Close - attached Under - crossing Engineering. 铁道工程学报, 2013, 30(7): 74-79.
Li Zhaoping, Li Mingkai, Huang Qinghua. A study of Construction Technique for the Naming Subway Station under the Nanjing Railway Station[ J]. Chinese Journal of Rock Mechanics and Engineering,2007(2) :4209 - 4213.
Wang Zhansheng, Zhang Dingli. Key Techniques on Shallow Embedded Tunnel Constructed Beneath Existing Subway Tunnel [ J ] ? Chinese Journal of Rock Mechanics and Engineering, 2007(2) :4209 - 4213.
Li Pengfei, Zhang Dingli,Fang Qian. Study on Deformation Distributing Principle Used in Construction of Tunnel Passing Through Existing Structures [ J ]. Journal of Beijing University of Technology, 2009(10): 1344-1349.
Chen Mengqiao, Yang Guangwu. Deformation Control of a Newly - built Subway Station Crossing the Adjacent Existing Subway Tunnel [J]. China Railway Science, 2011(4) ;53 - 59.
Lin Yunhong, Li Yiwei, Wang Fei. Study on Construction of Subsurface Excavated Metro Tunnel Under - passing Existing Railway [ J ]. Journal of Railway Engineering Society, 2012(11) ;82 -86.
Wu Halyang. Research on Impact and Safety Control Measures of Beijing Newly Built Subway Station Crossing the Existing Subway Station [D]. Beijing; Beijng Jiaotong University,2005.
Beijing Urban Engineering Design & Research Institute Co. Ltd. Gongzhufen Station Under - cross Existing Line Station Design Reporting [ R ]. Beijng; Beijng Urban Engineering Design & Research Institute Co. Ltd,2006.
Beijing Urban Construction Survey and Design Institute Co. Ltd. The Third - party Monitoring Summary Report of Gongzhufen Station [ R ].Beijing: Beijng Urban Construction Survey and Design Institute Co. Ltd, 2012.