Abstract:Research purposes:PSD’s insulation has occurred much more trouble since metro N0. 1 & N0. 2 began operations in Chengdu. The worst one is spark of PSD. By analyzing the spark accident, we find the reason and propose the solution practically. Find the reason that the PSD’s insulation decrease,improve its insulation-zone’s efficiency, then we can give advise to the next metro lines PSD’s insulation design,guide the modification of the other operating metro lines and ensure passenger' s safety and comfort.
Research conclusions:PSD’s equipotential body connects with rail potential, during the train runs, the rail potential is charged,so there is large current passing through PSD which causes the weak point of PSD sparking to the ground. If train reaches and stops at the platform,the rail voltage against earth is low and safe,doesn's exceed the safety voltage. When we remove the connection between PSD and rail potential, we can solve the PSD’s sparking trouble. When we paste insulating film on exposed part in stainless steel door of PSD,we can ensure passengers safety when they pass through PSD. During construction ,we should control the production quality and construction quality strictly, ensure the insulating effect, and avoid a series of problem caused by defective insulation.
刘永红. 成都地铁屏蔽门绝缘问题及处理[J]. 铁道工程学报, 2014, 31(4): 118-120.
LIU Yong-hong. Problem and Disposal of PSD’s Insulation for Chengdu Metro. 铁道工程学报, 2014, 31(4): 118-120.
Xie Jun. Study on Value and Sensitivity of Design Parameter of Segment Lining for Shield Tunnel[C] The Fourth Shanghai International Symposium。 Tunnel,Underground Construction and Risk Prevention Techniques. Shanghai ; Tongji Universe Press, 2009: 679-684.
Zhou Jimin, He Chuan, etc. Field Test and Numerical Simulation of Mechanics of Segment Lining of Shiziyaog Underwater Shield Tunnel[J].Journal of the China Railway Society , 2012 ( 32 ) ;115-121.
Li Decai , Hu Sen , Wang Mingnian. Key Techniques of Design and Construction for the Overlapped Tunnel in Shenzhen Metro[J].Modern Tunnelling Technology , 2003(4);21-26.
Chen Xianguo , Gao Bo. Research on Construction Mechanics of Overlapping Tunnels[ J]. Chinese Journal of Rock Mechanics and Engineering, 2003(4):606- 610.
Zhang Zhi中ang, He Chuan. Study on the Mechanical Behavior of a Metro knells Construction Adjacent to E}sting Pile Foundations in Shenzhen[J].Cutinize Journal of Geotechnical Urn}sneering. 2003(2):204- 2007
Ling Hao, Qiu Wenge, etc. Study of Adjacent Construction of Two Tube Shield Tunnels by Centrifugal Model Test [ J ] . Rock and Soil Mechanics , 2010(31);2894-2853.
Li Xiaokai , Tong Zhenghong. Detection Techniques with Geological Radar for Tunnels in High Speed Railway [J].Rahway standard Design, 2olz ( 2 > : ss-91.
Hu Jilong, Wang Weihua. Application of C-S Double- grout Segmented Water Stopping Technology in Munching Tunnel[J].Technology of Highway and Transport,2011(5):107-110.