Abstract:Research purposes : The comments are made in this paper tin the significance of introducing a railway to Tianjin Beach International Airport, and the studies are done on the schemes of introducing a railway from Beijing- Shanhaiguan Railway and Chenglinzhuang Corridor according to the distribution of existing buildings and long-term city plan far providing references to other similar construction.
Research methods: Considering the landform along the line and city plan , the comments are made on the schemes of in-troducing a railway to Tianjin Beach International Airport, and the overall comparasons are also made in technology and economy with methods of statistics, comparason and evaluating its advantages and disadvantages.
Research results: By the study on the schemes of introducing a railway to Tianjin Beach lnternational Airport, a feasible thinking on alignment, track jointing location and a series of useful technical measures are presented.
Research conclusions: The scheme of introducing a railway to Tianjin Beach International Airport from Beijing-Shan-haiguan Railway is the most reasonable, economical and feasible, considering the factors of the airport current conditions, city plan, removal of exciting buildings and passengers convenience.
阎建斌. 铁路引入天津国际滨海机场通路方案研究[J]. 铁道工程学报, 2007, 24(8): 1-3.
YAN Jian-bin. Study on the Scheme of Introducing Railway to Tianjin Beach International Airport. 铁道工程学报, 2007, 24(8): 1-3.