Abstract:Research purposes: As the introduction of ballastless track structure becomes the developed direction of high-speed railway line,this paper tries to get some solutions and suggestions in design application by analysis and research to subgrade for Shi Jiazhuang-Zhengzhou passenger dedicated railway line.
Research methods: Refering to some regulation and experience at home and abroad,this paper studies and compares the subgrade filling , groundwork treatment , transition segment location,economy of subgrade and bridge,etc. for Shi Jiazhuang-Zhengzhou passenger dedicated railway line.
Research results: For the high speed passenger dedicated railway line,the subgrade filling had better be crude and eligible or after improving test , the proper treatment measure should be adopted to control settlement , the transition segment should be properly designed and the height and section for the bridge and subgrade should be confirmed in reason.
Research conclusions: In the design of ballastless track railway subgrade of high-speed passenger dedicated line, especially in plain area. We should emphasize considering on subgrade filling , settlement control , transition section and subgrade and bridge compare etc. and confirm the best scheme by some necessary tests and methods of economy and technique comprehensive comparison.
郭建红. 石郑客运专线路基设计有关问题的研究[J]. 铁道工程学报, 2007, 24(4): 16-19.
GUO Jian-hong. Research on Problems about Design of Subgrade for Shi Jiazhuang- Zhengzhou Passenger Dedicated Railway Line. 铁道工程学报, 2007, 24(4): 16-19.