Abstract:This paper expounds the formation mechanism of the slide and settlement and the principle of the renovation in karst zone. Combined with the Meihua Mountain-Zhaotong section of Nei-Kun railway, the construction technology and the quality control process of grouting and renovation for railway subgrade in karst zone are given, emphasized the practicability in actual operation. It provides the reference basis for the analogous engineering in the future.
李彬峰. 路基岩溶塌陷注浆整治施工工艺探讨[J]. 铁道工程学报, 2003, 20(2): 23-26.
LI Bin-feng. DISCUSSION OF CONSTRUCTION TECHNOLOGY OF GROUTING AND REN-OVATION FOR SUBGRADE SLIDE AND SETTLEMENT IN KARST ZONE. 铁道工程学报, 2003, 20(2): 23-26.