Abstract:The article gives a minute description of the comprehensive construction technology of Lizhigou Bridge in Nei-Kun Railway Line. The main introduction includes the quick construction technology for deep foundation mass piles, the temperature control and preventing breaking technology for mass concrete, the prepare, manufacture and construction technology of rectangular variable cross section hydraulic lifting platform climbing frame, the line model control technology for high pier, the quick construction and joining technology for rigid frame-high piers, the technology of mechanization of comprehensive and complete sets, etc. It has achieved famous technologic, economic and social benefit, and provided successful experience for the future similar projects. It was worth to spread and apply widely.
刘金良. 群桩高墩大跨刚构-连续组合梁桥快速施工技术[J]. 铁道工程学报, 2001, 18(4): 80-84.
LIU Jin-liang. CONSTRUCTION TECHNOLOGY OF MASS PILES AND HIGH PIE BRIDGE WITH LONG SPAN AND RIGID FRAME-CONTINUOUS COMPOSITE BEAM. Journal of Railway Engineering Society, 2001, 18(4): 80-84.