Abstract:By applying the technique of continuous elastic foundation ground beam, the problem concerned with the bearing capacity of foundation ground may be solved. Under the prerequisite to satisfy structural design, engineering quality and construction safety, unnecessary large area excavation may be reduced, accident occurred against construction safety and the waste of manpower and material resources may be avoided, so as to raise the working efficiency and to reduce the time limit for the project.
戚丰武,王健. 连续弹性地基梁在隧道施工中的运用技术[J]. 铁道工程学报, 2001, 18(4): 93-95.
QI Feng-wu, WANG Jian. APPLYING TECHNIQUE OF CONTINUOUS ELASTIC FOUNDATION GROUND BEAM IN CONSTRUCTION OF TUNNEL. Journal of Railway Engineering Society, 2001, 18(4): 93-95.