Abstract:How to solv e the di fferent pro blems occurred in the desig n a nd construction procedures during the const ruction of tunnels in the Chongqing Sectio n o f the Cheng-Yu Ex pressw ay by mea ns of the adv ancement of technologies a re int ro duced brief ly in thi s pa per. They a re the selectio n o f the route a nd the posi tio n of the tuunel, applying the adv anced co nst ruction metho ds, doing w ell the w ater pro tectio n design in tunnel by using adv anced techno logic achiev ements, allocating , pro perly the mechanica l a nd elect rical equipments, etc. The impo rtance o f making reaso nable deci sion through advanced techno logies has been also i llust rated in thi s paper.
郑道访. 依靠科技进步,多快好省地修建公路隧道[J]. 铁道工程学报, 1998, 15(4): 71-76.
ZHENG Daofang. ACHIEVING GREATER, FASTER, BETTER AND MORE ECONOMICAL RESULTS FOR CONSTRUCTION OF HIGHWAY TUNNELS BYMEANSOF THE ADVANCEMENTOF TECHNOLOGIES. Journal of Railway Engineering Society, 1998, 15(4): 71-76.