摘要

本文分析我国首座铁路弯梁桥的预应力施工特点,介绍所采用的对策、弯梁孔道摩阻现 场及室内对比试验、弯梁钢束伸长量计算方法及实测值与计算值的吻合情况,预应力施加对弯梁 内力和变形所产生的影响

Abstract

The peper a naly zes the prest ressing fo rce co nst ructio n pro perties of the fi rst rai lw ay cantilever curved gi rder bridg e in china , and introduces tho se w ays to deal wi th i t , the cont rast experiment of the curved gi rder hole-f rictio n drag in field and indoo r, the steel-cable st retching amount calcula tion method and the comperion the field measured data to the ca lculation data, the effect the prestressing fo rce const ruction to the curv ed gi rder internal fo rce and displacement.

Key words

prest ressing force co nst ructio n / f riction drag ex periment / st retching amount calcula tion / internel fo rce v ariatio n

引用本文

导出引用
陈克望. 悬灌弯梁桥的预应力施工[J]. 铁道工程学报, 1998, 15(1): 73-81
Chan Kawang. PRESTRESSING FORCE CONSTRUCTION FOR CANTILEVER CURVED GIRDER BRIDGE[J]. Journal of Railway Engineering Society, 1998, 15(1): 73-81

参考文献

1 板其二号大桥PC曲线连续钢构. 弯曲预应力束孔道摩阻测试试验专题报告. 西南交通大学、铁道部第 二勘测设计院 1995. 12 2 板其二号大桥预应力混凝土曲线连续钢构. 悬灌施工监控研究报告. 兰州铁道学院土木工程系、铁道部 第五工程局 1996. 12 3 铁路桥涵施工规范( TBJ203- 86) 4 铁路混凝土及砌石工程施工规范( TBJ210- 86)

PDF(246 KB)

2585

Accesses

0

Citation

Detail

段落导航
相关文章

/